Project intelligenceTDLR TABS2026001054New Construction
Funding type

This project is privately funded, on private land for private use.

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3

18265 San Marcos Hwy, Martindale, TX, 78655

Opening ~Sep 2030Review Complete

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 is a new construction project at 18265 San Marcos Hwy, Martindale, in Caldwell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2030. The project has an estimated value of $2.5M across about 10,960 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,960 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$228/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4y 9mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 20251,826 days across supplied datesSep 16, 2030

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,715 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78655 (Martindale)

One email per change. Unsubscribe in one click. Privacy.

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 is a New Construction project located at 18265 San Marcos Hwy in Martindale, Texas. The project has an estimated value of $2.5M covering 10,960 sq ft. CALDWELL COUNTY EMERGENCY SERVICE DISTRICT #3 is the property owner and GKZ Inc. is the design firm of record. The project was registered with TDLR on September 16, 2025.

Frequently Asked Questions

What is A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3?

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 is a new construction project at 18265 San Marcos Hwy in Martindale, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new two-story fire station.

Is A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 open in Martindale?

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 is still under construction in Martindale, TX, with an estimated completion of Sep 2030 according to its TDLR registration.

Where is A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 located?

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 is located at 18265 San Marcos Hwy, Martindale, TX, 78655, in Caldwell County.

Who is the owner or developer of A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3?

CALDWELL COUNTY EMERGENCY SERVICE DISTRICT #3 is the property owner/developer of record for A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3, per its TDLR project registration.

Who is the architect or design firm for A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3?

GKZ Inc. is the design firm of record for A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3, according to its TDLR filing.

How much does A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 cost and how big is it?

A FIRE STATION PROJECT for CALDWELL COUNTY ESD #3 has an estimated construction value of $2.5M and approximately 10,960 square feet (about $228/sqft), based on its TDLR filing.

Scope of Work

Construction of a new two-story fire station.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

18265 San Marcos Hwy, Martindale, TX, 78655

29.85591, -97.85920

Watch all construction in 78655 (Martindale)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Martindale?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.