Project intelligenceTDLR TABS2026001159Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Harmonson Road (Dawn Road to Mackey Creek Channel) in North Richland Hills, TX

6400 Harmonson Road, North Richland Hills, TX, 76180

Opening ~Mar 2027Review Complete

Harmonson Road (Dawn Road to Mackey Creek Channel) is a renovation/alteration project at 6400 Harmonson Road, North Richland Hills, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $158K across about 68,298 sq ft.

Estimated project value
$158K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
68,298 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 17, 2025539 days across supplied datesMar 10, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    106 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    372 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Harmonson Road (Dawn Road to Mackey Creek Channel)

Harmonson Road (Dawn Road to Mackey Creek Channel) is a 68,298 sq ft roadway reconstruction project in North Richland Hills. The work covers the stretch from Dawn Road to the Mackey Creek Channel and includes upgrades to water, storm drainage, sidewalks, and ramps. The City of North Richland Hills is the owner of record for this renovation and alteration project located at 6400 Harmonson Road.

Quiddity Engineering serves as the design firm for this project. Ronald L Davis is the registered accessibility specialist listed in the filing. The project involves public funds and public land, consistent with municipal infrastructure improvements in Tarrant County. The estimated cost is $158,298, which equates to $2 per square foot.

This cost is below the county median of $79 per square foot for similar renovation and alteration filings in Tarrant County. The total estimated cost is also below the county median of $250,000 for this project type. The size of 68,298 sq ft is significantly larger than the county median of 3,900 sq ft for comparable filings.

Construction was scheduled to begin in November 2025. TDLR completed plan review in March 2026. The project is scheduled to finish in March 2027. This creates a scheduled build window of 478 days, which is longer than the county median of 92 days for similar projects. The TDLR status is listed as Review Complete.

The City of North Richland Hills has six other TDLR-registered projects totaling $4,896,900, including work on Chapman Road and the NRH2O Family Water Park. Quiddity Engineering has been involved in six other registered projects across Texas totaling $12,432,300, with work in locations such as Pflugerville and Brenham.

Harmonson Road (Dawn Road to Mackey Creek Channel) is located in ZIP code 76180. The U.S. Census ACS 2023 five-year estimates for this area show a population of about 37,900 and a median household income of $78,688. The Tarrant County unemployment rate was 4.6 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76180 (North Richland Hills)

One email per change. Unsubscribe in one click. Privacy.

Harmonson Road (Dawn Road to Mackey Creek Channel) is a Renovation/Alteration project located at 6400 Harmonson Road, North Richland Hills, TX 76180 in North Richland Hills, Texas. The project has an estimated value of $158K covering 68,298 sq ft. City of North Richland Hills is the property owner and Quiddity Engineering is the design firm of record. The project was registered with TDLR on September 17, 2025.

Frequently Asked Questions

What is the scope of the Harmonson Road project?

The project includes approximately 68,298 square feet of roadway reconstruction from Dawn Road to Mackey Creek Channel. It involves upgrades to water, storm, sidewalk, and ramp infrastructure.

When is the Harmonson Road construction scheduled to finish?

The project is scheduled to finish in March 2027. Construction began in November 2025, and TDLR completed plan review in March 2026.

Who is the design firm for this project?

Quiddity Engineering is the design firm of record. Ronald L Davis is the registered accessibility specialist associated with the filing.

What is the estimated cost of the project?

The estimated cost is $158,298. This translates to $2 per square foot, which is below the Tarrant County median for similar renovation and alteration filings.

Is the project currently open to the public?

The project is a construction phase for roadway renovation. The TDLR record indicates the status is Review Complete, with construction scheduled to finish in March 2027.

What is Harmonson Road (Dawn Road to Mackey Creek Channel)?

Harmonson Road (Dawn Road to Mackey Creek Channel) is a renovation/alteration project at 6400 Harmonson Road in North Richland Hills, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: approximately 68,298 sqft roadway reconstruction of Harmonson Road from Dawn Road to Mackey Creek Channel. Project to include water, storm, sidewalk, and ramps.

Is Harmonson Road (Dawn Road to Mackey Creek Channel) open in North Richland Hills?

Harmonson Road (Dawn Road to Mackey Creek Channel) is still under construction in North Richland Hills, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Harmonson Road (Dawn Road to Mackey Creek Channel) located?

Harmonson Road (Dawn Road to Mackey Creek Channel) is located at 6400 Harmonson Road, North Richland Hills, TX, 76180, in Tarrant County.

Who is the owner or developer of Harmonson Road (Dawn Road to Mackey Creek Channel)?

City of North Richland Hills is the property owner/developer of record for Harmonson Road (Dawn Road to Mackey Creek Channel), per its TDLR project registration.

Who is the architect or design firm for Harmonson Road (Dawn Road to Mackey Creek Channel)?

Quiddity Engineering is the design firm of record for Harmonson Road (Dawn Road to Mackey Creek Channel), according to its TDLR filing.

How much does Harmonson Road (Dawn Road to Mackey Creek Channel) cost and how big is it?

Harmonson Road (Dawn Road to Mackey Creek Channel) has an estimated construction value of $158K and approximately 68,298 square feet (about $2/sqft), based on its TDLR filing.

Scope of Work

approximately 68,298 sqft roadway reconstruction of Harmonson Road from Dawn Road to Mackey Creek Channel. Project to include water, storm, sidewalk, and ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6400 Harmonson Road, North Richland Hills, TX, 76180

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76180 (North Richland Hills)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in North Richland Hills?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.