Shop LC Global is a renovation/alteration project at 100 Micheal Angelo Way Ste 900, Round Rock, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $100K across about 720 sq ft.
Final inspection completed, awaiting project closure
Shop LC Global is a Renovation/Alteration project located at 100 Micheal Angelo Way Ste 900, Round Rock, TX 78728 in Round Rock, Texas. The project has an estimated value of $100K covering 720 sq ft. LARO PROPERTIES LP is the property owner and Red Design Studios is the design firm of record. The project was registered with TDLR on September 19, 2025.
Shop LC Global is a renovation/alteration project at 100 Micheal Angelo Way Ste 900 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adding a jewelry casting studio to a storage suite
Construction on Shop LC Global is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Shop LC Global is located at 100 Micheal Angelo Way Ste 900, Round Rock, TX, 78728, in Travis County.
LARO PROPERTIES LP is the property owner/developer of record for Shop LC Global, per its TDLR project registration.
Red Design Studios is the design firm of record for Shop LC Global, according to its TDLR filing.
Shop LC Global has an estimated construction value of $100K and approximately 720 square feet (about $139/sqft), based on its TDLR filing.
Adding a jewelry casting studio to a storage suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 19, 2025
Review Complete
Sep 19, 2025
Inspection Complete
Mar 8, 2026
Closed
170d
Construction phase
Building permits found at or near this location
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
Replacement of complete existing central heat and air system with or without duct work 4-TON HEAT PUMP CONDENSER CHANGE-OUT & 88K BTU AIR HANDLER CHANGE-OUT
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage closet
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
Replacement of complete existing central heat and air system with or without duct work 1 system: 5 Ton Variable Speed Condenser evaporator coil and gas furnace