Denton County Levee Improvement District Trail Project
Rockbrook Drive and MacArthur Boulevard, Lewisville, TX, 75067
Denton County Levee Improvement District Trail Project is a new construction project at Rockbrook Drive and MacArthur Boulevard, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 35,000 sq ft.
- Estimated project value
- $2.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 35,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $71/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
117 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75067 (Lewisville)
One email per change. Unsubscribe in one click. Privacy.
Denton County Levee Improvement District Trail Project is a New Construction project located at Rockbrook Drive and MacArthur Boulevard, Lewisville, TX 75067 in Lewisville, Texas. The project has an estimated value of $2.5M covering 35,000 sq ft. City of Lewisville is the property owner and Halff Associates, Inc. is the design firm of record. The project was registered with TDLR on September 24, 2025.
Frequently Asked Questions
What is Denton County Levee Improvement District Trail Project?
Denton County Levee Improvement District Trail Project is a new construction project at Rockbrook Drive and MacArthur Boulevard in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 2700 linear feet of public walking trail between Rockbrook Dr and MacArthur Blvd. Approximately 700 linear feet of public sidewalk, 16 curb ramps, and 4 school driveways along Rockbrook Dr.
Is Denton County Levee Improvement District Trail Project open in Lewisville?
Denton County Levee Improvement District Trail Project was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Denton County Levee Improvement District Trail Project located?
Denton County Levee Improvement District Trail Project is located at Rockbrook Drive and MacArthur Boulevard, Lewisville, TX, 75067, in Denton County.
Who is the owner or developer of Denton County Levee Improvement District Trail Project?
City of Lewisville is the property owner/developer of record for Denton County Levee Improvement District Trail Project, per its TDLR project registration.
Who is the architect or design firm for Denton County Levee Improvement District Trail Project?
Halff Associates, Inc. is the design firm of record for Denton County Levee Improvement District Trail Project, according to its TDLR filing.
How much does Denton County Levee Improvement District Trail Project cost and how big is it?
Denton County Levee Improvement District Trail Project has an estimated construction value of $2.5M and approximately 35,000 square feet (about $71/sqft), based on its TDLR filing.
Scope of Work
Approximately 2700 linear feet of public walking trail between Rockbrook Dr and MacArthur Blvd. Approximately 700 linear feet of public sidewalk, 16 curb ramps, and 4 school driveways along Rockbrook Dr.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Rockbrook Drive and MacArthur Boulevard, Lewisville, TX, 75067
Related Projects
Same Owner
$217.0M totalWatch all construction in 75067 (Lewisville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lewisville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.