Project intelligenceTDLR TABS2026001762Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

MRI #2 Equipment Replacement

7401 Main Street, Houston, TX, 77030

Target date passed (Feb 2026)Review Complete

MRI #2 Equipment Replacement is a renovation/alteration project at 7401 Main Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.1M across about 1,415 sq ft.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,415 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$777/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 4, 2024462 days across supplied datesFeb 9, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    324 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    138 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About MRI #2 Equipment Replacement

The Texas Orthopedic Hospital project at 7401 Main Street in Houston involves the replacement of MRI equipment within a 1,415 sq ft area. This renovation is registered under the project name MRI #2 Equipment Replacement and is owned by Orthopedic Hospital LTD. The estimated cost for this specific scope of work is $1,100,000, resulting in a computed cost per square foot of $777.

Bexhill is the design firm of record for this project, which is located in the Astrodome Area of Harris County. William T Winning serves as the registered accessibility specialist. The project is privately funded and situated on private land for private use. The filing identifies the type of work as Renovation/Alteration, with the specific scope limited to MRI equipment replacement.

Project Timeline and Status

Construction was scheduled to begin in November 2024, with a planned completion date of February 2026. The project was registered with TDLR in September 2025, and plan review was completed in the same month. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection. Consequently, the current state of the site is not confirmed in the public record, and the project status remains Review Complete rather than closed.

This project is one of two TDLR-registered projects for Orthopedic Hospital LTD. The other project, also located in Houston, totaled $1,000,000 and is marked as project closed. Bexhill has been involved in six other TDLR-registered projects totaling $13,077,000, including work at The Woman's Hospital of Texas and HCA Northwest facilities in Houston and Webster.

In the broader Harris County context, this project's estimated cost is above the county median for renovation and alteration filings. The scheduled build window of 462 days is longer than the county median of 92 days. The $777 per square foot cost is above the county median of $80 per square foot. These figures are derived from 39,069 TDLR-registered renovation and alteration filings in Harris County, with 5,361 registered in the last 24 months.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77030 (Houston)

One email per change. Unsubscribe in one click. Privacy.

MRI #2 Equipment Replacement is a Renovation/Alteration project located at 7401 Main Street, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $1.1M covering 1,415 sq ft. ORTHOPEDIC HOSPITAL LTD is the property owner and Bexhill is the design firm of record. The project was registered with TDLR on September 24, 2025.

Frequently Asked Questions

Is the Texas Orthopedic Hospital MRI upgrade project finished?

The scheduled completion date was February 2026, but TDLR has not yet recorded a final inspection. The public record shows the status as Review Complete, meaning the final state of the site is not confirmed.

What is the estimated cost of the MRI equipment replacement?

The estimated cost for the MRI #2 Equipment Replacement project is $1,100,000. This covers the renovation and alteration of the 1,415 sq ft area designated for the equipment upgrade.

Who is the owner and design firm for this project?

Orthopedic Hospital LTD is the owner of record. Bexhill is the design firm of record responsible for the project plans. William T Winning is the registered accessibility specialist.

Where is the project located?

The project is located at 7401 Main Street, Houston, TX 77030. This address is in the Astrodome Area of Harris County, near other medical and commercial businesses.

How does this project compare to other renovations in Harris County?

The $1,100,000 cost is above the county median for similar filings. The 462-day build window is longer than the 92-day median, and the $777 per sq ft cost exceeds the $80 median.

What is MRI #2 Equipment Replacement?

MRI #2 Equipment Replacement is a renovation/alteration project at 7401 Main Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: MRI equipment replacement

Is MRI #2 Equipment Replacement open in Houston?

MRI #2 Equipment Replacement was scheduled to finish construction in Feb 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is MRI #2 Equipment Replacement located?

MRI #2 Equipment Replacement is located at 7401 Main Street, Houston, TX, 77030, in Harris County.

Who is the owner or developer of MRI #2 Equipment Replacement?

ORTHOPEDIC HOSPITAL LTD is the property owner/developer of record for MRI #2 Equipment Replacement, per its TDLR project registration.

Who is the architect or design firm for MRI #2 Equipment Replacement?

Bexhill is the design firm of record for MRI #2 Equipment Replacement, according to its TDLR filing.

How much does MRI #2 Equipment Replacement cost and how big is it?

MRI #2 Equipment Replacement has an estimated construction value of $1.1M and approximately 1,415 square feet (about $777/sqft), based on its TDLR filing.

Scope of Work

MRI equipment replacement

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7401 Main Street, Houston, TX, 77030

Location by street address

Watch all construction in 77030 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.