Project intelligenceTDLR TABS2026001772Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Comerica Bank - Pavement Repairs in Friendswood, TX

203 S Friendswood Drive, Friendswood, TX, 77546, Friendswood, TX, 77546

Target date passed (Dec 2025)Project Registered

Comerica Bank - Pavement Repairs is a renovation/alteration project at 203 S Friendswood Drive, Friendswood, TX, 77546, Friendswood, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $240K across about 25,640 sq ft.

Estimated project value
$240K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
25,640 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
14 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 24, 202598 days across supplied datesDec 31, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    84 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Comerica Bank - Pavement Repairs

Comerica Bank is the owner of record for a site renovation project at 203 S Friendswood Drive in Friendswood, Texas. The filing, registered with TDLR in September 2025, identifies the work as Comerica Bank - Pavement Repairs. The project covers a site area of 25,640 sq ft with an estimated cost of $240,000.

The scope of work is strictly limited to exterior site improvements. It involves the removal and replacement of asphalt pavement base, as well as the removal and replacement of concrete sidewalks and pavement to ensure ADA compliance. The site layout and restriping will match the existing configuration. No changes to the building structure are included in this filing.

Project Details and Status

PEA Group is the design firm of record for this project. Monica J Harris is the registered accessibility specialist. The project is privately funded on private land for private use. The construction start date listed in the filing is December 2025, with a target completion date also set for December 2025. This indicates a very short scheduled build window of approximately 14 days.

The project status is Project Registered. No plan review or inspection has been recorded since registration. Therefore, whether the work proceeded as scheduled is not confirmed in the TDLR database. The registration date of September 2025 precedes the stated construction start date.

In Galveston County, the median estimated cost for renovation/alteration projects is $250,000. This project’s cost is close to that county median. The median size for such projects is 3,968 sq ft, while this project involves a site area of 25,640 sq ft. The median cost per square foot in the county is $74, whereas this project calculates to $9 per square foot, which is below the county median.

PEA Group has six other TDLR-registered projects in the region, totaling $5,659,850. These include projects in Baytown, Rosenberg, Houston, Spring, and Willis, all of which have completed review or inspection. Nearby registered projects in Friendswood include renovations by Laurel Park Friendswood III Ltd and Rivas Investment Group.

The area surrounding the site includes businesses such as Gulf Shore Orthodontics, Sundance Yoga Studio, and Dollar Tree. Census estimates for ZIP code 77546 indicate a population of about 54,082 and a median household income of $121,914. Housing in this area is predominantly owner-occupied, with a median home value of $354,300.

Galveston County unemployment was 5.1 percent in July 2026, higher than a year earlier. This project represents a private investment in site accessibility and pavement infrastructure at an existing bank location. The specific focus on ADA compliance through sidewalk and pavement replacement aligns with standard accessibility renovation practices for commercial sites in Texas.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77546 (Friendswood)

One email per change. Unsubscribe in one click. Privacy.

Comerica Bank - Pavement Repairs is a Renovation/Alteration project located at 203 S Friendswood Drive, Friendswood, TX, 77546, Friendswood, TX 77546 in Friendswood, Texas. The project has an estimated value of $240K covering 25,640 sq ft. Comerica Bank - Texas is the property owner and PEA Group is the design firm of record. The project was registered with TDLR on September 24, 2025.

Frequently Asked Questions

What is the scope of work for the Comerica Bank project in Friendswood?

The scope consists of asphalt pavement base removal and replacement, plus concrete sidewalk and pavement removal and replacement for ADA compliance. Site layout and restriping will match existing conditions. No building changes are included.

Is the Comerica Bank site work in Friendswood complete?

The filing lists a target completion date of December 2025. However, no plan review or inspection has been recorded, so completion is not confirmed in the public TDLR record.

Who is the design firm for this project?

PEA Group is the design firm of record. Monica J Harris is the registered accessibility specialist. The project is owned by Comerica Bank - Texas.

What is the estimated cost of the project?

The estimated cost is $240,000. This is close to the Galveston County median for renovation/alteration projects, which is $250,000. The cost per square foot is $9, below the county median of $74.

Is the bank open at this location?

The TDLR record only tracks construction status. It does not confirm whether the business is open. No plan review or inspection has been recorded, so construction status is unverified.

What is Comerica Bank - Pavement Repairs?

Comerica Bank - Pavement Repairs is a renovation/alteration project at 203 S Friendswood Drive, Friendswood, TX, 77546 in Friendswood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of work consists of only asphalt pavement base removal and replacement. And removal and replacement of concrete sidewalk and pavement to ensure ADA compliance. Site layout and restriping will match existing. No changes to build…

Is Comerica Bank - Pavement Repairs open in Friendswood?

Comerica Bank - Pavement Repairs was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Comerica Bank - Pavement Repairs located?

Comerica Bank - Pavement Repairs is located at 203 S Friendswood Drive, Friendswood, TX, 77546, Friendswood, TX, 77546, in Galveston County.

Who is the owner or developer of Comerica Bank - Pavement Repairs?

Comerica Bank - Texas is the property owner/developer of record for Comerica Bank - Pavement Repairs, per its TDLR project registration.

Who is the architect or design firm for Comerica Bank - Pavement Repairs?

PEA Group is the design firm of record for Comerica Bank - Pavement Repairs, according to its TDLR filing.

How much does Comerica Bank - Pavement Repairs cost and how big is it?

Comerica Bank - Pavement Repairs has an estimated construction value of $240K and approximately 25,640 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

The scope of work consists of only asphalt pavement base removal and replacement. And removal and replacement of concrete sidewalk and pavement to ensure ADA compliance. Site layout and restriping will match existing. No changes to building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

203 S Friendswood Drive, Friendswood, TX, 77546, Friendswood, TX, 77546

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77546 (Friendswood)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Friendswood?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.