Patel, Jinal
Patel, Jinal is a renovation/alteration project at 600 East Ben White Boulevard Suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $424K across about 2,008 sq ft.
๐Project Metrics
TDLR #TABS2026002002Inspection Complete
Final inspection completed, awaiting project closure
Patel, Jinal is a Renovation/Alteration project located at 600 East Ben White Boulevard Suite 300, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $424K covering 2,008 sq ft. Ben White Abby LLC is the property owner. The project was registered with TDLR on September 29, 2025.
โFrequently Asked Questions
What is Patel, Jinal?
Patel, Jinal is a renovation/alteration project at 600 East Ben White Boulevard Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant finish-out
Is Patel, Jinal open in Austin?
Construction on Patel, Jinal is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is Patel, Jinal located?
Patel, Jinal is located at 600 East Ben White Boulevard Suite 300, Austin, TX, 78704, in Travis County.
Who is the owner or developer of Patel, Jinal?
Ben White Abby LLC is the property owner/developer of record for Patel, Jinal, per its TDLR project registration.
How much does Patel, Jinal cost and how big is it?
Patel, Jinal has an estimated construction value of $424K and approximately 2,008 square feet (about $211/sqft), based on its TDLR filing.
๐Scope of Work
tenant finish-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 29, 2025
Review Complete
Sep 29, 2025
Inspection Complete
Apr 26, 2026
Closed
209d
Construction phase
๐Related Projects
๐คSame Owner
$724K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Add car charger
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Vertical Gas
Interior alteration of approximately 13455 SF of existing interior space.
Replace existing cast-iron sanitary sewer piping beneath the residence via tunneling. Also replace approximately 10 feet of sewer piping to correct an existing belly