Funding type
This project is privately funded, on private land for private use.
Onalaska Professional Building
Clifford Rowland III 4647 FM 3459, Onalaska, TX, 77360
Onalaska Professional Building is a new construction project at Clifford Rowland III 4647 FM 3459, Onalaska, in Polk County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $710K across about 13,125 sq ft.
- Estimated project value
- $710K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,125 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $54/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
123 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Onalaska Professional Building
The Onalaska Professional Building is a new 13,125 sq ft steel structure located at 4647 FM 3459 in Onalaska, Polk County. The project involves the construction of multiple office spaces within a 75'x175' footprint, developed by Onalaska Investments, LLC. This privately funded development sits on private land and is designed for private commercial use.
TDLR completed the plan review process in September 2025, with construction scheduled to begin in October 2025. The filing indicated a target completion date of February 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The registered accessibility specialist for this project is Tim Mullins.
The estimated cost for this new construction is $710,000, which calculates to $54 per square foot. This cost per square foot is below the county median of $172 for similar new construction filings in Polk County. The total estimated cost is close to the county median of $730,000. The scheduled build window of 123 days is shorter than the county median of 184 days for comparable projects.
Local context indicates that Onalaska is a small community with a population of about 6,130 according to U.S. Census ACS 2023 five-year estimates for ZIP 77360. The median household income in this area is $49,004, and the median owner-occupied home value is $141,300. Housing in the region is predominantly owner-occupied, with 3,284 housing units recorded.
Third-party sources have noted activity related to the building. A Facebook post by DroneBrosOfficial described the new commercial space as looking great from above, highlighting its modern multiplex design. Another Facebook post mentioned that The Crafty Goat planned to have a storefront in the building, scheduled to open in May to offer custom tshirts. A City of Onalaska meeting record noted a variance request for the Onalaska Professional Building was approved by a unanimous vote.
This placement avoids the regulatory and insurance complexities associated with higher-risk flood zones. The project remains a private development with no public funding or land use indicated in the TDLR filing.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77360 (Onalaska)
One email per change. Unsubscribe in one click. Privacy.
Onalaska Professional Building is a New Construction project located at Clifford Rowland III 4647 FM 3459 in Onalaska, Texas. The project has an estimated value of $710K covering 13,125 sq ft. Onalaska Investments, LLC is the property owner. The project was registered with TDLR on September 30, 2025.
Frequently Asked Questions
Is the Onalaska Professional Building open for business?
TDLR has not yet recorded a final inspection, so the construction status is not confirmed in the public record. While a Facebook post reported a tenant scheduled to open in May, the official completion status remains unverified by the state.
Who owns the Onalaska Professional Building?
The owner of record is Onalaska Investments, LLC. The project is privately funded and located on private land for private use, as indicated in the TDLR filing.
What is the size of the new building?
The building is 13,125 sq ft. The scope of work describes it as a 75'x175' steel building containing multiple office spaces.
Who is the registered accessibility specialist?
Tim Mullins is the registered accessibility specialist for this project, as listed in the TDLR registration filed in September 2025.
What is Onalaska Professional Building?
Onalaska Professional Building is a new construction project at Clifford Rowland III 4647 FM 3459 in Onalaska, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 75'x175' Steel Bldg with multiple office spaces
Is Onalaska Professional Building open in Onalaska?
Onalaska Professional Building was scheduled to finish construction in Feb 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Onalaska Professional Building located?
Onalaska Professional Building is located at Clifford Rowland III 4647 FM 3459, Onalaska, TX, 77360, in Polk County.
Who is the owner or developer of Onalaska Professional Building?
Onalaska Investments, LLC is the property owner/developer of record for Onalaska Professional Building, per its TDLR project registration.
How much does Onalaska Professional Building cost and how big is it?
Onalaska Professional Building has an estimated construction value of $710K and approximately 13,125 square feet (about $54/sqft), based on its TDLR filing.
Scope of Work
75'x175' Steel Bldg with multiple office spaces
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Clifford Rowland III 4647 FM 3459, Onalaska, TX, 77360
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 77360 (Onalaska)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Onalaska?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.