Design review complete, construction may proceed
Bridgepoint Square Building 1 - Tenant Lounge is a Renovation/Alteration project located at 6300 Bridge Point Parkway Suite 100, Austin, TX 78730 in Austin, Texas. The project has an estimated value of $430K covering 2,835 sq ft. MI Bridgepoint LLC is the property owner and Levy Dykema Architects is the design firm of record. The project was registered with TDLR on September 30, 2025.
Bridgepoint Square Building 1 - Tenant Lounge is a renovation/alteration project at 6300 Bridge Point Parkway Suite 100, Austin, TX 78730 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office suite for tenant amenity use.
Bridgepoint Square Building 1 - Tenant Lounge is still under construction in Austin, TX, with an estimated completion of Jul 2026 according to its TDLR registration.
Bridgepoint Square Building 1 - Tenant Lounge is located at 6300 Bridge Point Parkway Suite 100, Austin, TX 78730, Austin, TX, 78730, in Travis County.
MI Bridgepoint LLC is the property owner/developer of record for Bridgepoint Square Building 1 - Tenant Lounge, per its TDLR project registration.
Levy Dykema Architects is the design firm of record for Bridgepoint Square Building 1 - Tenant Lounge, according to its TDLR filing.
Bridgepoint Square Building 1 - Tenant Lounge has an estimated construction value of $430K and approximately 2,835 square feet (about $152/sqft), based on its TDLR filing.
Interior renovation of existing office suite for tenant amenity use.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 30, 2025
Review Complete
Sep 30, 2025
Inspection Complete
Closed
Building permits found at or near this location
upgrade panel and meter
Construct new driveway approach of 12 FT and sidewalk of 74 LF
Replacement of complete existing central heat and air system with or without duct work hvac change out
7 DAY - demising wall between units 400 and 420 - OVA
7 DAY - demising wall between units 400 and 420 - OVA