Project intelligenceTDLR TABS2026002290New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Wilbarger Creek Wastewater Treatment Plant Expansion in Manor, TX

547 Llano Street, Manor, TX, 78653

Opening ~Dec 2027Review Complete

Wilbarger Creek Wastewater Treatment Plant Expansion is a new construction project at 547 Llano Street, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $1.2M across about 3,800 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$313/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 1, 2025791 days across supplied datesDec 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    730 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Wilbarger Creek Wastewater Treatment Plant Expansion

The Wilbarger Sludge Building is a new 3,800 sq ft facility under construction at 547 Llano Street in Manor, Texas. This structure serves as the sludge building for the Wilbarger Creek Wastewater Treatment Plant Expansion. The project is registered with TDLR as a new construction effort for the City of Manor Public Works Department.

The estimated cost for this build is $1,187,900, which calculates to $313 per square foot. This figure is above the Travis County median of $125 per square foot for similar new construction filings. The total project cost is also above the county median of $1,000,000. The scheduled build window is 730 days, which is longer than the county median of 304 days.

George Butler Associates, Inc. is the design firm of record for this project. The firm has five other TDLR-registered projects totaling $46,615,104. These include two projects in Leander and one in Angleton. Kathy Ann Riley is the registered accessibility specialist associated with this filing. The project involves public funds and is located inside a FEMA Special Flood Hazard Area (zone A).

Timeline and Status

TDLR completed plan review in October 2025. The filing indicates that construction is scheduled to start in December 2025. The project is scheduled to finish in December 2027. This two-year timeline reflects the complexity of wastewater infrastructure work. The TDLR status is listed as Review Complete.

The site is located in Travis County, a region with a median household income of $92,799. The ZIP code 78653 has a population of about 35,417. Nearby businesses include a Starbucks Coffee Company and a Red Roof Inn. The Travis County unemployment rate was 3.9 percent in July 2026. This project is one of several registered constructions in the Manor area, including the Cal Tex Warehouse and Mister Car Wash.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78653 (Manor)

One email per change. Unsubscribe in one click. Privacy.

Wilbarger Creek Wastewater Treatment Plant Expansion is a New Construction project located at 547 Llano Street, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $1.2M covering 3,800 sq ft. City of Manor Public Works Department is the property owner and George Butler Associates, Inc. is the design firm of record. The project was registered with TDLR on October 1, 2025.

Frequently Asked Questions

Is the Wilbarger Sludge Building open?

The TDLR record shows construction is scheduled to finish in December 2027. It is not yet open to the public.

Who is building the Wilbarger Sludge Building?

The City of Manor Public Works Department is the owner of record. George Butler Associates, Inc. is the design firm for this project.

What is the address of this project?

The project is located at 547 Llano Street in Manor, Texas, within the 78653 ZIP code area.

How much does this project cost?

The estimated cost for the Wilbarger Sludge Building is $1,187,900, which is above the Travis County median for new construction.

When will construction start?

Construction is scheduled to start in December 2025, following the completion of plan review in October 2025.

What is Wilbarger Creek Wastewater Treatment Plant Expansion?

Wilbarger Creek Wastewater Treatment Plant Expansion is a new construction project at 547 Llano Street in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New sludge building for a wastewater treatment plant.

Is Wilbarger Creek Wastewater Treatment Plant Expansion open in Manor?

Wilbarger Creek Wastewater Treatment Plant Expansion is still under construction in Manor, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is Wilbarger Creek Wastewater Treatment Plant Expansion located?

Wilbarger Creek Wastewater Treatment Plant Expansion is located at 547 Llano Street, Manor, TX, 78653, in Travis County.

Who is the owner or developer of Wilbarger Creek Wastewater Treatment Plant Expansion?

City of Manor Public Works Department is the property owner/developer of record for Wilbarger Creek Wastewater Treatment Plant Expansion, per its TDLR project registration.

Who is the architect or design firm for Wilbarger Creek Wastewater Treatment Plant Expansion?

George Butler Associates, Inc. is the design firm of record for Wilbarger Creek Wastewater Treatment Plant Expansion, according to its TDLR filing.

How much does Wilbarger Creek Wastewater Treatment Plant Expansion cost and how big is it?

Wilbarger Creek Wastewater Treatment Plant Expansion has an estimated construction value of $1.2M and approximately 3,800 square feet (about $313/sqft), based on its TDLR filing.

Scope of Work

New sludge building for a wastewater treatment plant.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

547 Llano Street, Manor, TX, 78653

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

5478 WALNUT GROVE DR

replace main water line to home in yard

FinalPlumbing PermitRepairJan 2025
View Details
2024-166577 PP
Spot-On Plumbing LLC
5478 WALNUT GROVE DR

Replacement of complete existing central heat and air system with or without duct work 09/25 @ 3pm

FinalMechanical PermitChange OutApr 2020
View Details
2020-052445 MP
SERVICE WIZARD LLC
5478 WALNUT GROVE DR

foundation repair

ExpiredBuilding PermitRepairOct 2019
$6K
View Details
2019-202915 BP
Espinoza Foundation
5478 TIERRA ALTA CIR

Connect mobile home

FinalMechanical PermitRepairJun 2017
View Details
2017-067001 MP
Air Conductors LLC
5478 TIERRA ALTA CIR

connect mobile home

FinalElectrical PermitRepairJun 2017
View Details
2017-066998 EP
Allen Bebee Electric

Watch all construction in 78653 (Manor)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.