Project intelligenceTDLR TABS2026002311Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

John W. Runyon Elementary School - Org 237 in Dallas, TX

10750 Cradlerock Drive, Dallas, TX, 75217

Opening ~Nov 2027Review Complete

John W. Runyon Elementary School - Org 237 is a renovation/alteration project at 10750 Cradlerock Drive, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $4.3M across about 1,105 sq ft.

Estimated project value
$4.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,105 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.91K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 1, 2025783 days across supplied datesNov 23, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    264 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    519 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About John W. Runyon Elementary School - Org 237

The John W. Runyon Elementary School renovation project is scheduled to finish in November 2027, with construction starting in June 2026. This significant upgrade at 10750 Cradlerock Drive in Dallas involves a 1,105 sq ft expansion of the administration suite and the addition of a secure vestibule, alongside comprehensive interior and exterior improvements.

Dallas ISD is the owner of record for this work, which is registered with TDLR under the project name John W. Runyon Elementary School - Org 237. The estimated cost for the project is $4,325,107, reflecting a value of $3914 per square foot. This figure places the project in the top quarter of renovation and alteration filings in Dallas County by cost, well above the county median of $249,000 for similar work.

CaCo Architecture serves as the design firm of record, bringing experience from other major Dallas ISD projects including the Richard Lagow Elementary School and Everette Lee DeGolyer Elementary. The scope of work includes site and MEP improvements, ensuring the facility meets current standards for safety and functionality. The registered accessibility specialist for this project is Marcela Abadi Rhoads, ensuring compliance with state accessibility requirements.

The project timeline spans a scheduled build window of 519 days, which is longer than the county median of 92 days for renovation and alteration projects. This extended duration accounts for the complexity of the administration suite expansion and the necessary secure vestibule installation. TDLR completed plan review in October 2025, clearing the path for the June 2026 construction start.

Located in the 75217 ZIP code, the school serves a community with a median household income of $52,987 and a median owner-occupied home value of $164,800, according to U.S. Census ACS 2023 five-year estimates. The project involves public funds and public land, highlighting its importance to the local educational infrastructure. Dallas ISD has six other TDLR-registered projects, totaling $2,861,365, demonstrating a consistent investment in school facilities across the district.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75217 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

John W. Runyon Elementary School - Org 237 is a Renovation/Alteration project located at 10750 Cradlerock Drive, Dallas, TX 75217 in Dallas, Texas. The project has an estimated value of $4.3M covering 1,105 sq ft. Dallas ISD is the property owner and CaCo Architecture is the design firm of record. The project was registered with TDLR on October 1, 2025.

Frequently Asked Questions

When does construction start?

Construction is scheduled to start in June 2026, following the completion of the TDLR plan review in October 2025.

What is the total estimated cost?

The estimated cost for the John W. Runyon Elementary School renovation is $4,325,107.

Is the school open for classes?

The TDLR record tracks construction status, not daily operations. The project is scheduled to finish in November 2027.

What is included in the scope of work?

The scope includes exterior and interior renovations, a 1,105 sq ft administration suite expansion, a secure vestibule, and site and MEP improvements.

What is John W. Runyon Elementary School - Org 237?

John W. Runyon Elementary School - Org 237 is a renovation/alteration project at 10750 Cradlerock Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Exterior and Interior renovations, new administration suite expansion (1,105 SF) and secure vestibule, site and MEP improvements.

Is John W. Runyon Elementary School - Org 237 open in Dallas?

John W. Runyon Elementary School - Org 237 is still under construction in Dallas, TX, with an estimated completion of Nov 2027 according to its TDLR registration.

Where is John W. Runyon Elementary School - Org 237 located?

John W. Runyon Elementary School - Org 237 is located at 10750 Cradlerock Drive, Dallas, TX, 75217, in Dallas County.

Who is the owner or developer of John W. Runyon Elementary School - Org 237?

Dallas ISD is the property owner/developer of record for John W. Runyon Elementary School - Org 237, per its TDLR project registration.

Who is the architect or design firm for John W. Runyon Elementary School - Org 237?

CaCo Architecture is the design firm of record for John W. Runyon Elementary School - Org 237, according to its TDLR filing.

How much does John W. Runyon Elementary School - Org 237 cost and how big is it?

John W. Runyon Elementary School - Org 237 has an estimated construction value of $4.3M and approximately 1,105 square feet (about $3.91K/sqft), based on its TDLR filing.

Scope of Work

Exterior and Interior renovations, new administration suite expansion (1,105 SF) and secure vestibule, site and MEP improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10750 Cradlerock Drive, Dallas, TX, 75217

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75217 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.