AUS20
AUS20 is a renovation/alteration project at 2904 Palm Way, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 3,160 sq ft.
๐Project Metrics
TDLR #TABS2026002458Review Complete
Design review complete, construction may proceed
AUS20 is a Renovation/Alteration project located at 2904 Palm Way, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $1.0M covering 3,160 sq ft. TR Domain 9 LLC c/o Cousins Properties Inc is the property owner and WRNS Studio is the design firm of record. The project was registered with TDLR on October 2, 2025.
โFrequently Asked Questions
What is AUS20?
AUS20 is a renovation/alteration project at 2904 Palm Way in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: L1 Business Service Center and L16 Operations Center for internal staff use.
Is AUS20 open in Austin?
AUS20 is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is AUS20 located?
AUS20 is located at 2904 Palm Way, Austin, TX, 78758, in Travis County.
Who is the owner or developer of AUS20?
TR Domain 9 LLC c/o Cousins Properties Inc is the property owner/developer of record for AUS20, per its TDLR project registration.
Who is the architect or design firm for AUS20?
WRNS Studio is the design firm of record for AUS20, according to its TDLR filing.
How much does AUS20 cost and how big is it?
AUS20 has an estimated construction value of $1.0M and approximately 3,160 square feet (about $316/sqft), based on its TDLR filing.
๐Scope of Work
L1 Business Service Center and L16 Operations Center for internal staff use.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 2, 2025
Review Complete
Apr 12, 2026
Inspection Complete
Closed
192d
Review duration
๐Related Projects
๐คSame Owner
$138.7M total๐๏ธSame Design Firm
$24.1M total๐Related City Permits
Building permits found at or near this location
New Construction of 3-Story Single Family Res. [3bed 2.5bath] attached carport
Bldg 2 New Construction of 3-Story Single Family Res. [2bed 2.5bath] attached carport
ePlan: Residential Expedited Review - New Three Unit; Bldg 1 New Construction of 3-Story Single Family Res. [2bed 2.5bath] attached carport
Express: Foundation repair
90 tunnel below the foundation to replace entire drain system. 2 access holes - left right