๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

1400 E 6th

1400 E 6th ST, Austin, TX, 78702
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2026002741
$2.0M
Project Value
19,810
Square Feet
$101/sqft
Cost/SqFt
2 months
Duration
Registered:Oct 7, 2025
Start:Oct 1, 2026
Target:Nov 30, 2026
Remaining:339 days
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

Installation of new electric vehicle chargers and associated electrical equipment. This project will also include a bathroom building, perimeter fencing, shade canopies and repaving the parking lot.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
October 7, 2025
Review Complete
October 7, 2025
Construction Start
October 1, 2026
Expected Completion
November 30, 2026

๐Ÿ“Location & Views

Open in MapsGet Directions|30.26375, -97.72843

๐Ÿ“„Related City Permits

Building permits found at or near this location

1401 1/2 E 6TH ST
Same location

Install (1) set of reverse lit channel letters on backer panel with LED lighting

ActiveElectrical PermitWallAug 2024
View Details
2024-098668 EP
1402 1/2 E 6TH ST
Same location

Meter Installation for Small Cell Approved Permit # 2023-032472-000-00-SCP.

FinalElectrical PermitRepairNov 2024
View Details
2024-141380 EP
๐Ÿ”งKGI Wireless Inc.
1308 E 6TH ST
142 ft away

Install 90000 grain KDC Filtration unit in liquor storage room. Job to include the following: *Repipe all water lines in liquor storage room in PEX eliminating multiple types of piping (some materials are dissimilar & react negatively with one another) *Properly insulate and secure all water piping *Install 90000 grain KDC filtration unit at main water feed to building (to filter all incoming water) *Install discharge for the KDC & route to floor drain *Install isolation valves for the KDC for unit service (or to shut water off to the interior of the building in an emergency) *Pull & reset electric water heater in same location (wooden platform in very poor condition) * Re Route T&P line from hub drain to the exterior of the building *Install a water heater pan drain & terminate at the exterior of the building (to minimize damage from a water heater leak)

ExpiredPlumbing PermitRepairNov 2024
View Details
2024-143109 PP
๐Ÿ”งHonest Air Conditionining & Plumbing
1308 E 6TH ST
142 ft away

Run line from new Porta-John to existing sewer line in PVC. Connect grey water from new unit to sanitary drain piping. Connect cold water to Porta-John Lavatory. Install cleanout at end of Sewer line behind units. Run new vent through roof for cast iron stack at right rear of main building with flashing.

ExpiredPlumbing PermitRepairSep 2024
View Details
2024-111605 PP
๐Ÿ”งHonest Air Conditionining & Plumbing
1308 E 6TH ST
142 ft away

replace existing overhead electrical service

FinalElectrical PermitUpgradeMar 2023
View Details
2023-025932 EP
๐Ÿ”งEyes of Texas Electrical

Quick Actions

TDLR ID: TABS2026002741

Registered Accessibility Specialist

๐Ÿ“‹
BLAIR,BAKER
RAS #19
539 W COMMERCE ST SUITE 180, DALLAS, TX 75208