SiEnergy Phase 2 in Magnolia, TX
4003 Pinehurst Meadow, Magnolia, TX, 77355
SiEnergy Phase 2 is a new construction project at 4003 Pinehurst Meadow, Magnolia, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $700K across about 6,600 sq ft.
- Estimated project value
- $700K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $106/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
46 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
242 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SiEnergy Phase 2
SiEnergy Phase 2 is a new construction project at 4003 Pinehurst Meadow in Magnolia, Montgomery County. The filing describes the construction of an open shed building and an enclosed storage building, totaling 6,600 square feet. The estimated cost for the project is $700,000, which calculates to $106 per square foot.
The project was registered with TDLR in October 2025, with a scheduled construction start in December 2025 and a target completion date of July 2026. That target date has passed. However, no plan review or inspection has been recorded, so whether the work proceeded to completion is not confirmed in the public record.
SiEnergy is the owner and developer of record for this privately funded project on private land. Husmann Architecture, PLLC is the design firm of record. The registered accessibility specialist for the project is James Darrell Southerland.
In the context of Montgomery County new construction filings, this project’s cost is close to the county median of $800,000. The size of 6,600 square feet is below the county median of 9,430 square feet. The cost per square foot is close to the county median of $100. The scheduled build window of 242 days is close to the county median of 213 days.
Husmann Architecture, PLLC has six other TDLR-registered projects, including facilities in Austin, Alvin, Houston, Marble Falls, and Victoria. These projects range in cost from $150,000 to $2,000,000. Nearby registered projects in the area include Urban Constructors, Colony at Pinehurst, Gated Rental - Goodson Loop, and Pinehurst Retail.
The ZIP code 77355 area has a population of about 31,727 according to U.S. Census ACS 2023 five-year estimates. The median household income is $101,270, and the median owner-occupied home value is $329,700. Housing in this area is predominantly owner-occupied.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77355 (Magnolia)
One email per change. Unsubscribe in one click. Privacy.
SiEnergy Phase 2 is a New Construction project located at 4003 Pinehurst Meadow in Magnolia, Texas. The project has an estimated value of $700K covering 6,600 sq ft. SiEnergy is the property owner and Husmann Architecture, PLLC is the design firm of record. The project was registered with TDLR on October 16, 2025.
Frequently Asked Questions
Is SiEnergy Phase 2 open?
The TDLR record shows the project is registered, but no plan review or inspection has been recorded. The public record does not confirm if the business is operating.
What is being built at 4003 Pinehurst Meadow?
The filing specifies the construction of an open shed building and an enclosed storage building. The total square footage is 6,600 sq ft.
Who is the developer of SiEnergy Phase 2?
SiEnergy is the owner and developer of record. Husmann Architecture, PLLC is the design firm of record for the project.
What is the estimated cost of the project?
The estimated cost is $700,000. This equates to $106 per square foot for the 6,600 sq ft structure.
Is the project in a flood zone?
It is designated as zone X according to FEMA National Flood Hazard Layer data.
What is SiEnergy Phase 2?
SiEnergy Phase 2 is a new construction project at 4003 Pinehurst Meadow in Magnolia, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of an open shed building and an enclosed storage building
Is SiEnergy Phase 2 open in Magnolia?
SiEnergy Phase 2 was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is SiEnergy Phase 2 located?
SiEnergy Phase 2 is located at 4003 Pinehurst Meadow, Magnolia, TX, 77355, in Montgomery County.
Who is the owner or developer of SiEnergy Phase 2?
SiEnergy is the property owner/developer of record for SiEnergy Phase 2, per its TDLR project registration.
Who is the architect or design firm for SiEnergy Phase 2?
Husmann Architecture, PLLC is the design firm of record for SiEnergy Phase 2, according to its TDLR filing.
How much does SiEnergy Phase 2 cost and how big is it?
SiEnergy Phase 2 has an estimated construction value of $700K and approximately 6,600 square feet (about $106/sqft), based on its TDLR filing.
Scope of Work
Construction of an open shed building and an enclosed storage building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4003 Pinehurst Meadow, Magnolia, TX, 77355
Related Projects
Same Design Firm
$3.3M totalWatch all construction in 77355 (Magnolia)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Magnolia?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.