Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Park Various Locations - Restroom Improvements Phase 2 - 2024 in Spring, TX
6727 Cypresswood Dr., Spring, TX, 77379
Park Various Locations - Restroom Improvements Phase 2 - 2024 is a new construction project at 6727 Cypresswood Dr., Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $500K across about 821 sq ft.
- Estimated project value
- $500K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 821 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $609/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
118 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Park Various Locations - Restroom Improvements Phase 2 - 2024
Harris County Flood Control District is building a new 821-square-foot restroom facility at Collins Park in Spring, Texas. The project, filed under the name Park Various Locations - Restroom Improvements Phase 2 - 2024, is a new construction effort estimated at $500,000. This work is part of a broader accessibility initiative, with TDLR plan review completed in October 2025 and construction scheduled to finish in February 2027.
The site is located at 6727 Cypresswood Dr., Spring, TX 77379, within Harris County. The scope of work specifically covers the design and construction of the new restroom structure. The Office of the County Engineer serves as the design firm of record for this project. Robert W Green is the registered accessibility specialist associated with the filing. The project involves public funds and public land, reflecting its status as a municipal infrastructure improvement.
Project Context and Comparisons
In Harris County, the median estimated cost for new construction filings is $750,000, while the median size is 9,000 square feet. This Collins Park project is below the county median for cost but significantly smaller in scale. The estimated cost per square foot is $609, which is above the county median of $88 per square foot. The scheduled build window for this project is 365 days, which is longer than the county median of 220 days for similar new construction filings.
Harris County Flood Control District has six other TDLR-registered projects totaling $22,469,000, including trail improvements in Houston and a distribution center. The Office of the County Engineer has five other registered projects totaling $3,085,750, such as White Cedar Pocket Park and Sagemeadow Park. These prior filings indicate an ongoing commitment to park infrastructure and public facility upgrades across the region.
The surrounding area, ZIP code 77379, has a population of about 83,163 residents according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $110,712, and the median owner-occupied home value is $335,900. Housing in this ZIP code is predominantly owner-occupied. Third-party descriptions from Visit Houston Texas and TripAdvisor note that Collins Park is a 55-acre facility along Cypress Creek with sports fields and nature trails, providing context for the new restroom addition.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77379 (Spring)
One email per change. Unsubscribe in one click. Privacy.
Park Various Locations - Restroom Improvements Phase 2 - 2024 is a New Construction project located at 6727 Cypresswood Dr., Spring, TX 77379 in Spring, Texas. The project has an estimated value of $500K covering 821 sq ft. Harris County Flood Control District is the property owner and Office of the County Engineer is the design firm of record. The project was registered with TDLR on October 21, 2025.
Frequently Asked Questions
When is the restroom construction scheduled to finish?
Construction is scheduled to finish in February 2027. Work is set to start in February 2026, following TDLR plan review completion in October 2025.
Who is the owner of the Collins Park restroom project?
The owner of record is the Harris County Flood Control District. The project is located at 6727 Cypresswood Dr. in Spring, Texas.
What is the estimated cost of the new restroom?
The estimated cost is $500,000. The facility is 821 square feet, resulting in an estimated cost of $609 per square foot.
Is the new restroom open to the public?
The TDLR record indicates construction is scheduled to finish in February 2027. It is not open, as the project is in the pre-construction or early construction phase.
Who is the design firm for this project?
The Office of the County Engineer is the design firm of record. Robert W Green is the registered accessibility specialist.
What is Park Various Locations - Restroom Improvements Phase 2 - 2024?
Park Various Locations - Restroom Improvements Phase 2 - 2024 is a new construction project at 6727 Cypresswood Dr. in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Design and construction of a new restroom at Collins Park. Estimated square footage is 821 SF.
Is Park Various Locations - Restroom Improvements Phase 2 - 2024 open in Spring?
Park Various Locations - Restroom Improvements Phase 2 - 2024 is still under construction in Spring, TX, with an estimated completion of Feb 2027 according to its TDLR registration.
Where is Park Various Locations - Restroom Improvements Phase 2 - 2024 located?
Park Various Locations - Restroom Improvements Phase 2 - 2024 is located at 6727 Cypresswood Dr., Spring, TX, 77379, in Harris County.
Who is the owner or developer of Park Various Locations - Restroom Improvements Phase 2 - 2024?
Harris County Flood Control District is the property owner/developer of record for Park Various Locations - Restroom Improvements Phase 2 - 2024, per its TDLR project registration.
Who is the architect or design firm for Park Various Locations - Restroom Improvements Phase 2 - 2024?
Office of the County Engineer is the design firm of record for Park Various Locations - Restroom Improvements Phase 2 - 2024, according to its TDLR filing.
How much does Park Various Locations - Restroom Improvements Phase 2 - 2024 cost and how big is it?
Park Various Locations - Restroom Improvements Phase 2 - 2024 has an estimated construction value of $500K and approximately 821 square feet (about $609/sqft), based on its TDLR filing.
Scope of Work
Design and construction of a new restroom at Collins Park. Estimated square footage is 821 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6727 Cypresswood Dr., Spring, TX, 77379
Related Projects
Same Owner
$82.5M totalWatch all construction in 77379 (Spring)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spring?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.