Project intelligenceTDLR TABS2026003942Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Uvalde County Knippa Park Improvements

3 Main Street, Knippa, TX, 78870

Construction complete · Jan 2026Inspection Complete

Uvalde County Knippa Park Improvements is a renovation/alteration project at 3 Main Street, Knippa, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $150K across about 5,000 sq ft.

Estimated project value
$150K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$30/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 16, 2025510 days across supplied datesSep 8, 2026

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    188 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    98 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    224 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Uvalde County Knippa Park Improvements

The Uvalde County Knippa Park Improvements project in Knippa is complete. The site, located at 3 Main Street, passed its final TDLR accessibility inspection in January 2026. This renovation and alteration work transformed a 5,000 sq ft area of the park, adding a new playscape, trail, and pavilion.

Uvalde County serves as the owner and developer of record for this $150,000 project. The work was designed by Davis Powell Architect, with Stephen A Meyer registered as the accessibility specialist. The project was registered with TDLR in October 2025, and plan review was completed in the same month. Although the filing listed a construction start in April 2025 and a completion date in September 2026, the final inspection occurred in January 2026.

Project Cost and Size

The estimated cost of $150,000 equates to $30 per square foot. This figure is below the county median of $100 per square foot for similar renovation and alteration filings in Uvalde County. The total project cost is also below the county median of $265,000 for this project type. The 5,000 sq ft scope is larger than the county median of 2,433 sq ft for comparable projects.

The scheduled build window for this project was 510 days, which is longer than the county median of 153 days. Public funds were used for this project, which involves public land. The project is one of 13 TDLR-registered renovation or alteration filings in Uvalde County in the last 24 months.

Local Context

Knippa has a population of about 1,225 according to U.S. Census ACS 2023 five-year estimates for ZIP 78870. The median household income in this area is $73,070, and the median owner-occupied home value is $177,700. Housing in the area is predominantly owner-occupied, with 432 housing units recorded. Uvalde County had an unemployment rate of 5.3 percent in July 2026, which is higher than a year earlier.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78870 (Knippa)

One email per change. Unsubscribe in one click. Privacy.

Uvalde County Knippa Park Improvements is a Renovation/Alteration project located at 3 Main Street, Knippa, TX 78870 in Knippa, Texas. The project has an estimated value of $150K covering 5,000 sq ft. Uvalde County is the property owner and Davis Powell Architect is the design firm of record. The project was registered with TDLR on October 21, 2025.

Frequently Asked Questions

Is the Knippa Park Improvements project finished?

Yes, the project is complete. The site passed its final TDLR accessibility inspection in January 2026, confirming that the construction work for the new playscape, trail, and pavilion has concluded.

Who designed the new park facilities?

Davis Powell Architect is the design firm of record for the Uvalde County Knippa Park Improvements. Stephen A Meyer served as the registered accessibility specialist for the project.

What was the total cost of the renovation?

The estimated cost for the Uvalde County Knippa Park Improvements was $150,000. This amount covers the addition of a new playscape, trail, and pavilion across 5,000 sq ft of the park.

Who owns the Knippa Park site?

Uvalde County is the owner and developer of record for the project. The site is located at 3 Main Street in Knippa, Texas, and is funded with public funds.

What is Uvalde County Knippa Park Improvements?

Uvalde County Knippa Park Improvements is a renovation/alteration project at 3 Main Street in Knippa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New playscape, trail, and pavilion

Is Uvalde County Knippa Park Improvements open in Knippa?

Construction on Uvalde County Knippa Park Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.

Where is Uvalde County Knippa Park Improvements located?

Uvalde County Knippa Park Improvements is located at 3 Main Street, Knippa, TX, 78870, in Uvalde County.

Who is the owner or developer of Uvalde County Knippa Park Improvements?

Uvalde County is the property owner/developer of record for Uvalde County Knippa Park Improvements, per its TDLR project registration.

Who is the architect or design firm for Uvalde County Knippa Park Improvements?

Davis Powell Architect is the design firm of record for Uvalde County Knippa Park Improvements, according to its TDLR filing.

How much does Uvalde County Knippa Park Improvements cost and how big is it?

Uvalde County Knippa Park Improvements has an estimated construction value of $150K and approximately 5,000 square feet (about $30/sqft), based on its TDLR filing.

Scope of Work

New playscape, trail, and pavilion

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3 Main Street, Knippa, TX, 78870

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78870 (Knippa)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.