Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School
3820 Shaver St, South Houston, TX, 77587
Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School is a renovation/alteration project at 3820 Shaver St, South Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $1.0M across about 1,535 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,535 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $651/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
139 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
52 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
157 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
259 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School
South Houston High School at 3820 Shaver St in South Houston completed a renovation of its Career and Technical Education culinary facilities. The project, filed under the Pasadena ISD 2022 Bond, involved a 1,535 sq ft alteration to the existing school structure. The work was finished, and the building passed its final TDLR accessibility inspection in October 2026.
Pasadena Independent School District owned the project, with GPD Group Professional Corporation serving as the design firm of record. The estimated cost was $1,000,000, resulting in a cost of $651 per square foot. This figure is above the Harris County median of $80 per square foot for similar renovation and alteration filings. The total estimated cost is also above the county median of $250,000 for this type of work.
Project Timeline and Scope
The project was registered with TDLR in October 2025. Plan review was completed in May 2026, and construction started in March 2026. The filing listed a completion date of June 2027, but the final inspection occurred earlier, in October 2026. The scheduled build window of 468 days is longer than the Harris County median of 92 days for renovation and alteration projects.
The site is located in a FEMA moderate-risk flood zone, designated as zone X with a 0.2 percent annual-chance flood hazard. The project involved public funds and public land. Laura Fulkerson is the registered accessibility specialist listed on the filing. The TDLR status is Inspection Complete, confirming the accessibility requirements were met.
Regional Context
Pasadena Independent School District has six other TDLR-registered projects totaling $3,816,730, including renovations at Sam Rayburn High School and Pasadena Memorial High School. GPD Group Professional Corporation has worked on six other registered projects totaling $4,580,000, including commercial developments in Willis, Katy, and Tomball. The local area includes other registered projects such as the Retail Center and Market at Almeda Mall, both listed as renovation and alteration work.
According to U.S. Census ACS 2023 five-year estimates for ZIP 77587, the population is about 16,058 with a median household income of $52,407. The Harris County unemployment rate was 5.2 percent in July 2026, higher than a year earlier. Third-party sources, such as the school’s official website, list the address as 3820 S. Shaver, South Houston, Texas 77587, confirming the location details provided in the TDLR filing.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77587 (South Houston)
One email per change. Unsubscribe in one click. Privacy.
Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School is a Renovation/Alteration project located at 3820 Shaver St, South Houston, TX 77587 in South Houston, Texas. The project has an estimated value of $1.0M covering 1,535 sq ft. Pasadena Independent School District is the property owner and GPD Group Professional Corporation is the design firm of record. The project was registered with TDLR on October 31, 2025.
Frequently Asked Questions
Is the South Houston High School culinary lab complete?
Yes, the building passed its final TDLR accessibility inspection in October 2026. The TDLR status is listed as Inspection Complete, indicating the renovation work is finished.
Who designed the South Houston High School culinary renovation?
GPD Group Professional Corporation is the design firm of record. Pasadena Independent School District is the owner and developer of the project.
How much did the South Houston High School renovation cost?
The estimated cost was $1,000,000 for 1,535 square feet. This amounts to $651 per square foot, which is above the Harris County median for similar renovation projects.
When did construction start and finish for this project?
Construction started in March 2026. The final TDLR accessibility inspection was passed in October 2026, marking the completion of the work.
Is the South Houston High School open to the public?
The TDLR record only confirms the completion of the construction and accessibility inspection. It does not provide information about public access or business operating hours.
What is Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School?
Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School is a renovation/alteration project at 3820 Shaver St in South Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1535 SF Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School
Is Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School open in South Houston?
Construction on Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School located?
Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School is located at 3820 Shaver St, South Houston, TX, 77587, in Harris County.
Who is the owner or developer of Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School?
Pasadena Independent School District is the property owner/developer of record for Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School, per its TDLR project registration.
Who is the architect or design firm for Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School?
GPD Group Professional Corporation is the design firm of record for Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School, according to its TDLR filing.
How much does Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School cost and how big is it?
Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School has an estimated construction value of $1.0M and approximately 1,535 square feet (about $651/sqft), based on its TDLR filing.
Scope of Work
1535 SF Pasadena ISD - 2022 Bond - CTE Culinary - South Houston High School
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3820 Shaver St, South Houston, TX, 77587
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$412.7M totalWatch all construction in 77587 (South Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in South Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.