Flame Broiler
Flame Broiler is a renovation/alteration project at 3500 E Parmer LN, Unit 12140, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2026. The project has an estimated value of $300K across about 1,453 sq ft.
๐Project Metrics
TDLR #TABS2026004830Review Complete
Design review complete, construction may proceed
Flame Broiler is a Renovation/Alteration project located at 3500 E Parmer LN, Unit 12140, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $300K covering 1,453 sq ft. RH RA-7 COMMERCIAL QOZB LLC is the property owner and Reese Design Services is the design firm of record. The project was registered with TDLR on October 31, 2025.
โFrequently Asked Questions
What is Flame Broiler?
Flame Broiler is a renovation/alteration project at 3500 E Parmer LN, Unit 12140 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out for a new restaurant
Is Flame Broiler open in Austin?
Flame Broiler is still under construction in Austin, TX, with an estimated completion of Jul 2026 according to its TDLR registration.
Where is Flame Broiler located?
Flame Broiler is located at 3500 E Parmer LN, Unit 12140, Austin, TX, 78754, in Travis County.
Who is the owner or developer of Flame Broiler?
RH RA-7 COMMERCIAL QOZB LLC is the property owner/developer of record for Flame Broiler, per its TDLR project registration.
Who is the architect or design firm for Flame Broiler?
Reese Design Services is the design firm of record for Flame Broiler, according to its TDLR filing.
How much does Flame Broiler cost and how big is it?
Flame Broiler has an estimated construction value of $300K and approximately 1,453 square feet (about $206/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out for a new restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 31, 2025
Review Complete
Oct 31, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$7.8M total๐Related City Permits
Building permits found at or near this location
Inground pool and spa; no decking
(2nd Generation Space): Interior Tenant build-out of a new Killer Burger restaurant in an existing building. Work includes: New non-load bearing partition walls new interior finishes throughout space modifications to electrical service devices and low voltage system modifications to HVAC system modifications to existing plumbing. (2 Apps)
requesting an Emergency permit. Suite has lost power. Will need to replace the faulty main service breaker enclosure
Installation of 540kW AC Roof Mounted Auxiliary Power System ***VOID per Hyatt Dunn** -AP 7/9/26
New 2-story 5 bedroom 5.5 bathroom single family residence with attached garage covered front porch and rear covered patio.