Brakes Plus
Brakes Plus is a new construction project at 640 West State Highway 71, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $1.5M across about 4,900 sq ft.
๐Project Metrics
TDLR #TABS2026004866Review Complete
Design review complete, construction may proceed
Brakes Plus is a New Construction project located at 640 West State Highway 71 in Bastrop, Texas. The project has an estimated value of $1.5M covering 4,900 sq ft. Brakes Plus is the property owner and ARCODEV ARCHITECTS PC is the design firm of record. The project was registered with TDLR on November 3, 2025.
โFrequently Asked Questions
What is Brakes Plus?
Brakes Plus is a new construction project at 640 West State Highway 71 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground up construction of an auto service facility with associated site work
Is Brakes Plus open in Bastrop?
Brakes Plus is still under construction in Bastrop, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Brakes Plus located?
Brakes Plus is located at 640 West State Highway 71, Bastrop, TX, 78602, in Bastrop County.
Who is the owner or developer of Brakes Plus?
Brakes Plus is the property owner/developer of record for Brakes Plus, per its TDLR project registration.
Who is the architect or design firm for Brakes Plus?
ARCODEV ARCHITECTS PC is the design firm of record for Brakes Plus, according to its TDLR filing.
How much does Brakes Plus cost and how big is it?
Brakes Plus has an estimated construction value of $1.5M and approximately 4,900 square feet (about $306/sqft), based on its TDLR filing.
๐Scope of Work
Ground up construction of an auto service facility with associated site work
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 3, 2025
Review Complete
Dec 12, 2025
Inspection Complete
Closed
39d
Review duration
๐Related Projects
๐คSame Owner
$168.0M total๐๏ธSame Design Firm
$186.0M total๐Related City Permits
Building permits found at or near this location
EXPRESS: Replace 25 windows like for like
Minor interior remodel of existing kitchen and bathrooms. Work includes replacing cabinets counter tops and fixtures in existing locations repairing the shower liner/curb; replacing flooring painting; repairing drywall finishes; replacing same size doors; updating electrical fixtures/outlets; installing recessed lighting; installing two exterior coach lights and limited vent hood/grille work.
Bldg #1 New 3-story single family residence 4 bed/3.5 bath attached garage covered porch and balcony green building smart housing
Bldg #2 New 3-story single family residence 4 bed/3.5 bath attached garage covered porch and balcony green building smart housing
Bldg #4 New 2-story single family residence 4 bed/2.5 bath attached garage covered porch and covered patio green building smart housing
Property Owner
Design Firm
Registered Accessibility Specialist
Bastrop County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bastrop County
Find General Contractors in Bastrop