Project intelligenceTDLR TABS2026004917New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Castle Park and Robot Park Equipment Replacement

1801 Winscott Road, Benbrook, TX, 76126

Target date passed (Jul 2026)Project Registered

Castle Park and Robot Park Equipment Replacement is a new construction project at 1801 Winscott Road, Benbrook, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.9M across about 23,000 sq ft.

Estimated project value
$1.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
23,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$83/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 3, 2025240 days across supplied datesJul 1, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Castle Park and Robot Park Equipment Replacement

Dutch Branch Park in Benbrook is undergoing a $1,900,000 new construction project to replace existing playground equipment with updated units. The work covers 23,000 square feet of site area at 1801 Winscott Road, with the City of Benbrook listed as the owner of record. This filing is registered under the name Castle Park and Robot Park Equipment Replacement, identifying the specific zones within the park that are being modernized.

The project was registered with TDLR in November 2025, with a scheduled construction start in January 2026 and a target completion date of July 2026. That target date has passed, yet no plan review or inspection has been recorded in the public record. Consequently, it remains unconfirmed whether the work proceeded as planned or if the timeline has shifted. The registration status remains active, but the lack of inspection data means the physical completion of the playground upgrades is not verified by state records.

Project Scope and Cost

The scope of work is strictly defined as replacing existing playground equipment with new, updated units. The estimated cost of $1,900,000 places this project above the median estimated cost of $800,000 for new construction filings in Tarrant County over the last 24 months. However, the cost per square foot is calculated at $83, which is below the county median of $120 per square foot. The scheduled build window of 181 days is close to the county median of 214 days for similar projects. This cost structure reflects a significant capital investment in public recreational infrastructure, consistent with other City of Benbrook projects such as the Benbrook Municipal Complex.

Kompan Playgrounds is the design firm of record for this project. The area profile for ZIP code 76126 indicates a population of about 25,920 residents and a median household income of $107,668, according to U.S. Census ACS 2023 five-year estimates. The project involves public funds and public land, ensuring that the improvements serve the local community directly. Tarrant County unemployment stood at 4.7 percent in June 2026, a figure higher than a year earlier, providing context for the local labor market during this construction period.

Local Context and Status

Third-party sources provide additional context regarding the park's operations. A post on the City of Benbrook's official website noted that Castle Park and Robot Park playgrounds were scheduled to close for construction beginning June 1, 2026, while the rest of Dutch Branch Park and its pavilions would remain open. Local coverage on benbrooklife.com described the park as the heart of Benbrook life, highlighting its duck pond, sports fields, and walking trails. These sources suggest an active construction phase, but the TDLR record remains the authoritative source for regulatory status, which shows no recorded inspections despite the passed completion date.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76126 (Benbrook)

One email per change. Unsubscribe in one click. Privacy.

Castle Park and Robot Park Equipment Replacement is a New Construction project located at 1801 Winscott Road, Benbrook, TX 76126 in Benbrook, Texas. The project has an estimated value of $1.9M covering 23,000 sq ft. City of Benbrook is the property owner and Kompan Playgrounds is the design firm of record. The project was registered with TDLR on November 3, 2025.

Frequently Asked Questions

Is Dutch Branch Park playground construction finished?

The target completion date of July 2026 has passed, but no plan review or inspection has been recorded in the TDLR public record. Therefore, the official status of the project's completion is not confirmed by state data.

Who is responsible for the playground equipment replacement?

The City of Benbrook is the owner of record. Kompan Playgrounds is the design firm listed in the filing. The registered accessibility specialist is Connie Fleming.

What is the estimated cost of the project?

The estimated cost is $1,900,000. This figure is above the median cost for new construction in Tarrant County, while the cost per square foot of $83 is below the county median of $120.

What specific work is being performed?

The scope of work is to replace existing playground equipment with new, updated playground equipment. The filing names this as the Castle Park and Robot Park Equipment Replacement project.

What is Castle Park and Robot Park Equipment Replacement?

Castle Park and Robot Park Equipment Replacement is a new construction project at 1801 Winscott Road in Benbrook, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace existing playground equipment with new, updated playground equipment.

Is Castle Park and Robot Park Equipment Replacement open in Benbrook?

Castle Park and Robot Park Equipment Replacement was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Castle Park and Robot Park Equipment Replacement located?

Castle Park and Robot Park Equipment Replacement is located at 1801 Winscott Road, Benbrook, TX, 76126, in Tarrant County.

Who is the owner or developer of Castle Park and Robot Park Equipment Replacement?

City of Benbrook is the property owner/developer of record for Castle Park and Robot Park Equipment Replacement, per its TDLR project registration.

Who is the architect or design firm for Castle Park and Robot Park Equipment Replacement?

Kompan Playgrounds is the design firm of record for Castle Park and Robot Park Equipment Replacement, according to its TDLR filing.

How much does Castle Park and Robot Park Equipment Replacement cost and how big is it?

Castle Park and Robot Park Equipment Replacement has an estimated construction value of $1.9M and approximately 23,000 square feet (about $83/sqft), based on its TDLR filing.

Scope of Work

Replace existing playground equipment with new, updated playground equipment.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1801 Winscott Road, Benbrook, TX, 76126

Location by street address

Watch all construction in 76126 (Benbrook)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Benbrook?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.