MOTOR CONTROL CENTER BUILDING in Houston, TX
7207 COCKRUM BLVD., Houston, TX, 77066
MOTOR CONTROL CENTER BUILDING is a new construction project at 7207 COCKRUM BLVD., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2029. The project has an estimated value of $120K across about 600 sq ft.
- Estimated project value
- $120K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $200/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
378 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
849 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MOTOR CONTROL CENTER BUILDING
The Harris County #191 Motor Control Building is a new construction project located at 7207 Cockrum Blvd. in Houston, Texas. This 600-square-foot facility is designed to serve as a motor control center for the Harris County MUD No. 191 Wastewater Treatment Plant. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the filing name "Motor Control Center Building." Construction is scheduled to finish in March 2029, with work starting in November 2026.
MWA Architects, Inc. is the design firm of record for this project. The estimated cost of the build is $120,000, which equates to $200 per square foot. This cost per square foot is above the Harris County median of $88 for similar new construction filings. The total estimated cost is below the county median of $750,000 for this type of work. The scheduled build window of 849 days is longer than the county median of 219 days.
According to the TDLR record, plan review was completed in November 2025. The project involves public funds and public land. Kenneth Otten is the registered accessibility specialist listed for this filing. The project status is Review Complete.
Design and Context
MWA Architects, Inc. has six other TDLR-registered projects in the region. These include facilities for The Boeing Company in Pasadena, Harris County MUD 249 in Spring, and Aldine ISD in Houston. The firm also designed schools in Missouri City and Sugar Land. The total value of these other projects is $7,464,906.
The project is located in ZIP code 77066. U.S. Census American Community Survey 2023 five-year estimates indicate a population of about 38,315 in this area. The median household income is estimated at $83,545. There are approximately 12,156 housing units, with a median owner-occupied home value of $217,500. Housing in this area is predominantly owner-occupied. The Harris County unemployment rate was 5.2 percent in July 2026, which is higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77066 (Houston)
One email per change. Unsubscribe in one click. Privacy.
MOTOR CONTROL CENTER BUILDING is a New Construction project located at 7207 COCKRUM BLVD., Houston, TX 77066 in Houston, Texas. The project has an estimated value of $120K covering 600 sq ft. HARRIS COUNTY MUD #191 is the property owner and MWA Architects, Inc. is the design firm of record. The project was registered with TDLR on November 4, 2025.
Frequently Asked Questions
Where is the Harris County #191 Motor Control Building located?
The project is located at 7207 Cockrum Blvd. in Houston, Texas 77066. It is a new construction facility for the Harris County MUD No. 191 Wastewater Treatment Plant.
What is the estimated cost of the project?
The estimated cost is $120,000. This is below the Harris County median cost for similar new construction filings, which is $750,000.
When is construction scheduled to start and finish?
Construction is scheduled to start in November 2026. The project is scheduled to finish in March 2029.
Who is the design firm for this project?
MWA Architects, Inc. is the design firm of record. They have six other TDLR-registered projects in the region, including schools and industrial facilities.
Is the building open for business?
The project is under construction. TDLR records show plan review was completed in November 2025, but the building is not yet operational.
What is MOTOR CONTROL CENTER BUILDING?
MOTOR CONTROL CENTER BUILDING is a new construction project at 7207 COCKRUM BLVD. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new motor control center facility for the Harris County MUD No. 191 Wastewater Treatment Plant.
Is MOTOR CONTROL CENTER BUILDING open in Houston?
MOTOR CONTROL CENTER BUILDING is still under construction in Houston, TX, with an estimated completion of Mar 2029 according to its TDLR registration.
Where is MOTOR CONTROL CENTER BUILDING located?
MOTOR CONTROL CENTER BUILDING is located at 7207 COCKRUM BLVD., Houston, TX, 77066, in Harris County.
Who is the owner or developer of MOTOR CONTROL CENTER BUILDING?
HARRIS COUNTY MUD #191 is the property owner/developer of record for MOTOR CONTROL CENTER BUILDING, per its TDLR project registration.
Who is the architect or design firm for MOTOR CONTROL CENTER BUILDING?
MWA Architects, Inc. is the design firm of record for MOTOR CONTROL CENTER BUILDING, according to its TDLR filing.
How much does MOTOR CONTROL CENTER BUILDING cost and how big is it?
MOTOR CONTROL CENTER BUILDING has an estimated construction value of $120K and approximately 600 square feet (about $200/sqft), based on its TDLR filing.
Scope of Work
A new motor control center facility for the Harris County MUD No. 191 Wastewater Treatment Plant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
7207 COCKRUM BLVD., Houston, TX, 77066
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77066 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.