CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street in Fort Worth, TX
2399 N Main Street, Fort Worth, TX, 76164
CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street is a renovation/alteration project at 2399 N Main Street, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $85K across about 1,150 sq ft.
- Estimated project value
- $85K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,150 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $74/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
116 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
118 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source record
📰About CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street
CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street is complete in Fort Worth’s North Side. The City of Fort Worth finished this $85,000 renovation at 2399 N Main Street, Fort Worth, TX 76164. The project passed its final TDLR accessibility inspection in June 2026, confirming that construction is finished.
The scope of work included paving and traffic signal improvements at the intersection. The city also installed a sidewalk, push button, curb ramp, and crosswalk markings. These pedestrian improvements covered 1,150 sq ft of the site. George A Patterson served as the registered accessibility specialist for the project.
Project Specifications and Cost
Freese and Nichols, Inc. was the design firm of record for CPN 103949. The total estimated cost of $85,000 is below the county median for renovation and alteration filings in Tarrant County. The median estimated cost for similar projects in the county is $250,000. The cost per square foot for this intersection improvement was $74, which is close to the county median of $79 per sq ft.
The scheduled build window for this project was 122 days, which is longer than the county median of 92 days. The project was registered with TDLR in November 2025, and plan review was completed in the same month. Construction was scheduled to begin in March 2026, with a completion date listed for July 2026. The final inspection status is marked as Inspection Complete.
Local Context and Ownership
The City of Fort Worth owns the project, which is one of several TDLR-registered initiatives in the area. Other registered projects for the city include the Martin Luther King Jr Community and Aquatic Center and Cunningham Road HROM. The site is located in ZIP code 76164, where the U.S. Census estimates the population at about 13,134 residents. The median household income in this area is $51,618, and the median owner-occupied home value is $140,200.
Nearby businesses include Joe T. Garcia's, Esperanza's Restaurant & Bakery, and Cattlemen's Steak House. The Tarrant County unemployment rate was 4.6 percent in July 2026. This project contributes to infrastructure and accessibility improvements in Tarrant County, supporting local development and community needs.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76164 (Fort Worth)
One email per change. Unsubscribe in one click. Privacy.
CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street is a Renovation/Alteration project located at 2399 N Main Street, Fort Worth, TX 76164 in Fort Worth, Texas. The project has an estimated value of $85K covering 1,150 sq ft. City of Fort Worth is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on November 5, 2025.
Frequently Asked Questions
Is the construction at Main Street and 24th Street finished?
Yes, the project passed its final TDLR accessibility inspection in June 2026. The TDLR status is listed as Inspection Complete, confirming that the construction phase is done.
What specific improvements were made to the intersection?
The work included paving, traffic signal improvements, and the installation of a sidewalk, push button, curb ramp, and crosswalk markings. The pedestrian improvements covered 1,150 sq ft.
Who was the design firm for this project?
Freese and Nichols, Inc. was the design firm of record. George A Patterson served as the registered accessibility specialist for the project.
How does the cost compare to other projects in Tarrant County?
The $85,000 cost is below the county median of $250,000 for renovation and alteration filings. The cost per square foot of $74 is close to the county median of $79.
When did the project start and finish?
Construction was scheduled to start in March 2026. The project passed its final TDLR accessibility inspection in June 2026, indicating completion.
What is CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street?
CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street is a renovation/alteration project at 2399 N Main Street in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Paving, and traffic signal improvements at intersection. Installation of sidewalk, push button, curb ramp, and crosswalk markings. 1150 SF of pedestrian improvements.
Is CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street open in Fort Worth?
Construction on CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street located?
CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street is located at 2399 N Main Street, Fort Worth, TX, 76164, in Tarrant County.
Who is the owner or developer of CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street?
City of Fort Worth is the property owner/developer of record for CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street, per its TDLR project registration.
Who is the architect or design firm for CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street?
Freese and Nichols, Inc. is the design firm of record for CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street, according to its TDLR filing.
How much does CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street cost and how big is it?
CPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street has an estimated construction value of $85K and approximately 1,150 square feet (about $74/sqft), based on its TDLR filing.
Scope of Work
Paving, and traffic signal improvements at intersection. Installation of sidewalk, push button, curb ramp, and crosswalk markings. 1150 SF of pedestrian improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2399 N Main Street, Fort Worth, TX, 76164
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$4.79B totalWatch all construction in 76164 (Fort Worth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Fort Worth?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.