Stony Point HS Additions & Renovations
Stony Point HS Additions & Renovations is a additions to existing building project at 1801 Tiger Trail, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $70.6M across about 423,600 sq ft.
๐Project Metrics
TDLR #TABS2026005228Project Registered
Project has been registered with TDLR and is in pre-construction phase
Stony Point HS Additions & Renovations is a Additions to Existing Building project located at 1801 Tiger Trail, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $70.6M covering 423,600 sq ft. Round Rock ISD is the property owner and VLK is the design firm of record. The project was registered with TDLR on November 6, 2025.
โFrequently Asked Questions
What is Stony Point HS Additions & Renovations?
Stony Point HS Additions & Renovations is a additions to existing building project at 1801 Tiger Trail in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Scope of work includes mechanical & roofing replacement of the main school, track resurfacing, baseball/softball field turf, interior renovation of fine arts and building finishes, dance/ROTC building addition, and classroom addition.
Is Stony Point HS Additions & Renovations open in Round Rock?
Stony Point HS Additions & Renovations is still under construction in Round Rock, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is Stony Point HS Additions & Renovations located?
Stony Point HS Additions & Renovations is located at 1801 Tiger Trail, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of Stony Point HS Additions & Renovations?
Round Rock ISD is the property owner/developer of record for Stony Point HS Additions & Renovations, per its TDLR project registration.
Who is the architect or design firm for Stony Point HS Additions & Renovations?
VLK is the design firm of record for Stony Point HS Additions & Renovations, according to its TDLR filing.
How much does Stony Point HS Additions & Renovations cost and how big is it?
Stony Point HS Additions & Renovations has an estimated construction value of $70.6M and approximately 423,600 square feet (about $167/sqft), based on its TDLR filing.
๐Scope of Work
Scope of work includes mechanical & roofing replacement of the main school, track resurfacing, baseball/softball field turf, interior renovation of fine arts and building finishes, dance/ROTC building addition, and classroom addition.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 6, 2025
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$442.5M total๐Related City Permits
Building permits found at or near this location
Express- Replace siding around house exterior and around electrical box. Electrical Permit
Addition/ remodel of existing 1-story single-family residential to include: rear addition of bedroom study 1 bath utility room mud room covered rear patio and two uncovered wood deck steps. Complete interior remodel of existing structure.
QT - Replacment of three sliding glass doors for a residential unit. Each door unit has two fixed and one operable panel. Specification sheet is included for reference. - OVA
Temporary Power for the Lake Travis Church of Christ NO BP [ETJ] [AE ]
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [1bed 1bath] with attached Garage. Unit B