Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Utah Sidewalk in Celina, TX
550 S Utah Dr, Celina, TX, 75009
Utah Sidewalk is a new construction project at 550 S Utah Dr, Celina, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $200K across about 5,000 sq ft.
- Estimated project value
- $200K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $40/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
106 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
6 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
48 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
52 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Utah Sidewalk
The City of Celina completed a new construction project on the east side of Utah Drive, installing 900 linear feet of 5-foot reinforced concrete sidewalk. This infrastructure work connects W Oak Street to Lykins Elementary School at 550 S Utah Dr, Celina, TX 75009. The project scope was strictly defined by the filing, focusing on the linear installation of the concrete pathway rather than broader site development.
Project Scope and Cost
Registered with the Texas Department of Licensing and Regulation (TDLR) in November 2025, the project listed an estimated cost of $200,000. The filing specified a size of 5,000 square feet, resulting in a computed cost of $40 per square foot. This figure sits below the Collin County median of $120 per square foot for similar new construction filings. The scheduled build window was 112 days, which is shorter than the county median of 212 days for comparable projects.
The City of Celina served as the owner and developer of record for this public works project. The funding source is identified as involving public funds, public land, or a Federally funded roadway project. Jeffrey Deon Brown was the registered accessibility specialist associated with the filing. The plan review process was completed in November 2025, aligning with the registration date.
Construction began in July 2025, with a completion date on the filing set for November 2025. The final inspection passed in January 2026, confirming the work met the required standards. In February 2026, TDLR closed the project file, which marks the end of the accessibility review process for this construction. This closure finalizes the regulatory status of the sidewalk installation.
The City of Celina has six other TDLR-registered projects totaling $91,018,000, including the Administration Building and Celina Fire Station #4. While this sidewalk project is a smaller component of the city's infrastructure portfolio, it serves a critical function for students and families accessing the school. The area profile for ZIP 75009 indicates a median household income of $166,064 and a median owner-occupied home value of $471,300, reflecting the established residential nature of the neighborhood surrounding the school.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75009 (Celina)
One email per change. Unsubscribe in one click. Privacy.
Utah Sidewalk is a New Construction project located at 550 S Utah Dr, Celina, TX 75009 in Celina, Texas. The project has an estimated value of $200K covering 5,000 sq ft. City of Celina is the property owner. The project was registered with TDLR on November 11, 2025.
Frequently Asked Questions
Is the sidewalk project finished?
Yes, the final inspection passed in January 2026. TDLR closed the project file in February 2026, marking the end of the accessibility review process for this construction.
Who paid for this sidewalk?
The City of Celina is the owner of record. The project involves public funds, public land, or is a Federally funded roadway project.
How long is the new sidewalk?
The project installed 900 linear feet of 5-foot reinforced concrete sidewalk along the east side of Utah Drive.
What is the estimated cost?
The filing lists an estimated cost of $200,000 for the 5,000 square foot project, which computes to $40 per square foot.
What is Utah Sidewalk?
Utah Sidewalk is a new construction project at 550 S Utah Dr in Celina, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install 900 LF of 5' reinforced concrete sidewalk along east side of Utah Dr from W Oak St to Lykins Elementary School
Is Utah Sidewalk open in Celina?
Construction on Utah Sidewalk is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is Utah Sidewalk located?
Utah Sidewalk is located at 550 S Utah Dr, Celina, TX, 75009, in Collin County.
Who is the owner or developer of Utah Sidewalk?
City of Celina is the property owner/developer of record for Utah Sidewalk, per its TDLR project registration.
How much does Utah Sidewalk cost and how big is it?
Utah Sidewalk has an estimated construction value of $200K and approximately 5,000 square feet (about $40/sqft), based on its TDLR filing.
Scope of Work
Install 900 LF of 5' reinforced concrete sidewalk along east side of Utah Dr from W Oak St to Lykins Elementary School
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
550 S Utah Dr, Celina, TX, 75009
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75009 (Celina)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Celina?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.