Project intelligenceTDLR TABS2026005561Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TTU Holden Hall First Floor Toilet Room Renovation in Lubbock, TX

2500 Broadway, Lubbock, TX, 79409

Opening ~Dec 2026Review Complete

TTU Holden Hall First Floor Toilet Room Renovation is a renovation/alteration project at 2500 Broadway, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $400K across about 420 sq ft.

Estimated project value
$400K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
420 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$952/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 11, 2025415 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About TTU Holden Hall First Floor Toilet Room Renovation

Texas Tech University is renovating the first-floor toilet rooms in Holden Hall at 2500 Broadway in Lubbock. The project, filed as TTU Holden Hall First Floor Toilet Room Renovation, involves approximately 420 square feet of work within the existing structure. This targeted alteration focuses specifically on updating the restroom facilities on the ground floor of the building.

The estimated cost for this renovation is $400,000. With a scope of 420 square feet, the project calculates to a cost of $952 per square foot. This figure is above the county median of $100 per square foot for renovation and alteration projects registered in Lubbock County over the last 24 months. The total cost is also above the county median of $300,000 for similar work types.

Project Timeline and Status

Texas Tech University registered the project with the Texas Department of Licensing and Regulation in November 2025. Plan review was completed in December 2025, and the TDLR status is listed as Review Complete. Construction is scheduled to start in January 2026 and is scheduled to finish in December 2026. This represents a build window of 364 days, which is longer than the county median of 123 days for comparable renovation projects.

Condray Design Group is the design firm of record for this project. Stephen D Macphie is the registered accessibility specialist associated with the filing. The project involves public funds and public land. Texas Tech University has six other TDLR-registered projects in Lubbock totaling $4,225,000, including renovations to the Student Union Building and the Health Sciences Center.

Local Context and Nearby Sites

Holden Hall is located in a dense academic area of Lubbock. Nearby businesses and institutions include the Student Union Building, the University Library, and the Edward E. Whitacre Jr. College of Engineering. Other registered construction projects in the immediate area include renovations at the Lubbock County Hospital District and Covenant Medical Center. The project site is also near One Guy from Italy University, a meal delivery service, and the Department of Mathematics and Statistics.

Lubbock County had an unemployment rate of 4.3 percent in July 2026, which is higher than a year earlier. This renovation is part of a broader pattern of institutional maintenance and improvement in the region. The specific focus on accessibility and restroom renovation aligns with the university's commitment to facility standards. The project is a discrete alteration rather than a new construction, impacting only a small portion of the existing building footprint.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79409 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

TTU Holden Hall First Floor Toilet Room Renovation is a Renovation/Alteration project located at 2500 Broadway, Lubbock, TX 79409 in Lubbock, Texas. The project has an estimated value of $400K covering 420 sq ft. Texas Tech University is the property owner and Condray Design Group is the design firm of record. The project was registered with TDLR on November 11, 2025.

Frequently Asked Questions

Where is the Holden Hall renovation located?

The renovation is at 2500 Broadway in Lubbock, Texas. It is part of Texas Tech University's campus and specifically involves the first-floor toilet rooms in Holden Hall.

How much is the Holden Hall renovation costing?

The estimated cost is $400,000. This covers approximately 420 square feet of bathroom renovation work, resulting in a cost of $952 per square foot.

When will the Holden Hall renovation be finished?

Construction is scheduled to start in January 2026 and is scheduled to finish in December 2026. Plan review was already completed in December 2025.

Who is designing the Holden Hall renovation?

Condray Design Group is the design firm of record. Stephen D Macphie is the registered accessibility specialist for the project filed with TDLR.

Is Holden Hall open for visitors during the renovation?

The TDLR record details construction status but does not specify visitor access policies. The renovation is limited to first-floor toilet rooms, but specific operational hours or closures are not listed in the filing.

What is TTU Holden Hall First Floor Toilet Room Renovation?

TTU Holden Hall First Floor Toilet Room Renovation is a renovation/alteration project at 2500 Broadway in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approx 420sf of renovation of existing bathrooms

Is TTU Holden Hall First Floor Toilet Room Renovation open in Lubbock?

TTU Holden Hall First Floor Toilet Room Renovation is still under construction in Lubbock, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is TTU Holden Hall First Floor Toilet Room Renovation located?

TTU Holden Hall First Floor Toilet Room Renovation is located at 2500 Broadway, Lubbock, TX, 79409, in Lubbock County.

Who is the owner or developer of TTU Holden Hall First Floor Toilet Room Renovation?

Texas Tech University is the property owner/developer of record for TTU Holden Hall First Floor Toilet Room Renovation, per its TDLR project registration.

Who is the architect or design firm for TTU Holden Hall First Floor Toilet Room Renovation?

Condray Design Group is the design firm of record for TTU Holden Hall First Floor Toilet Room Renovation, according to its TDLR filing.

How much does TTU Holden Hall First Floor Toilet Room Renovation cost and how big is it?

TTU Holden Hall First Floor Toilet Room Renovation has an estimated construction value of $400K and approximately 420 square feet (about $952/sqft), based on its TDLR filing.

Scope of Work

Approx 420sf of renovation of existing bathrooms

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2500 Broadway, Lubbock, TX, 79409

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79409 (Lubbock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.