Project intelligenceTDLR TABS2026005696New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre in Houston, TX

Commerce Street between Austin St and Elysian St; Elysian Street between Commerce St and Runnels St, Houston, TX, 77002

Construction complete · Aug 2026Inspection Complete

BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre is a new construction project at Commerce Street between Austin St and Elysian St; Elysian Street between Commerce St and Runnels St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $770K across about 1 sq ft.

Estimated project value
$770K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$770.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 12, 2025309 days across supplied datesSep 17, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    125 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    148 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre

Segment BU04B / WBS No. F-BGBU04B-0001-4 is a 0.3-mile shared-use path connecting Austin Street to Runnels Street in downtown Houston. The project, owned by the Houston Parks Board, passed its final TDLR accessibility inspection in August 2026. Construction is complete, and the TDLR status is recorded as Inspection Complete.

SWA Group served as the design firm for this new construction project. The estimated cost was $770,000, a figure close to the Harris County median for similar filings. The scheduled build window was 184 days, which is close to the county median of 219 days. The path runs within the City of Houston and Texas Department of Transportation right-of-way.

Location and Scope

The route follows Commerce Street between Austin Street and Elysian Street, and Elysian Street between Commerce Street and Runnels Street. Laura Fulkerson is the registered accessibility specialist for Segment BU04B. The filing indicates the project involves public funds, public land, or is a Federally funded roadway project. The project was registered with TDLR in November 2025, with plan review completed in March 2026.

Construction began in March 2026, and the final inspection occurred in August 2026. The Houston Parks Board has six other TDLR-registered projects in Houston, including the Buffalo Bayou Greenway and Brays Bayou Greenway. SWA Group also has six other registered projects in the region, including developments in Cypress and New Waverly.

The project is located in ZIP code 77002. U.S. Census ACS 2023 five-year estimates indicate a population of about 19,616 in this area. The median household income is $85,436, and the median owner-occupied home value is $286,100. Housing in this ZIP code is predominantly renter-occupied, with 8,960 housing units recorded.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77002 (Houston)

One email per change. Unsubscribe in one click. Privacy.

BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre is a New Construction project located at Commerce Street between Austin St and Elysian St; Elysian Street between Commerce St and Runnels St, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $770K covering 1 sq ft. Houston Parks Board is the property owner and SWA Group is the design firm of record. The project was registered with TDLR on November 12, 2025.

Frequently Asked Questions

Is the shared-use path complete?

Yes, Segment BU04B passed its final TDLR accessibility inspection in August 2026. The TDLR status is Inspection Complete, indicating construction is finished.

Who designed this path segment?

SWA Group is the design firm of record for Segment BU04B / WBS No. F-BGBU04B-0001-4. They are responsible for the accessibility design of this 0.3-mile path.

How much did this project cost?

The estimated cost for Segment BU04B was $770,000. This figure is close to the Harris County median for similar new construction filings.

Where exactly is the path located?

The path is located on Commerce Street between Austin and Elysian Streets, and Elysian Street between Commerce and Runnels Streets in Houston, TX 77002.

What is the TDLR registration status?

The project was registered in November 2025. Plan review was completed in March 2026, and the final inspection was passed in August 2026.

What is BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre?

BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre is a new construction project at Commerce Street between Austin St and Elysian St; Elysian Street between Commerce St and Runnels St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Implementation of a Shared-Use Path within COH and TXDOT ROW to connect Austin St to Runnels St; approx. 0.3 miles

Is BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre open in Houston?

Construction on BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre located?

BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre is located at Commerce Street between Austin St and Elysian St; Elysian Street between Commerce St and Runnels St, Houston, TX, 77002, in Harris County.

Who is the owner or developer of BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre?

Houston Parks Board is the property owner/developer of record for BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre, per its TDLR project registration.

Who is the architect or design firm for BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre?

SWA Group is the design firm of record for BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre, according to its TDLR filing.

How much does BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre cost and how big is it?

BU04B: Buffalo Bayou Downtown Trail - East (Greenway Improvement) - Austin St to Runnels St On-Stre has an estimated construction value of $770K and approximately 1 square feet (about $770.00K/sqft), based on its TDLR filing.

Scope of Work

Implementation of a Shared-Use Path within COH and TXDOT ROW to connect Austin St to Runnels St; approx. 0.3 miles

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Commerce Street between Austin St and Elysian St; Elysian Street between Commerce St and Runnels St, Houston, TX, 77002

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77002 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.