Project intelligenceTDLR TABS2026005717Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Parmer Lane (RM 734) at SH45 Intersection in Georgetown, TX

Parmer Lane (RM 734) at SH45 Intersection, Georgetown, TX, 78717

Opening ~Dec 2026Project Registered

Parmer Lane (RM 734) at SH45 Intersection is a renovation/alteration project at Parmer Lane (RM 734) at SH45 Intersection, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $5.2M across about 1 sq ft.

Estimated project value
$5.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5165.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 12, 2025396 days across supplied datesDec 13, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    221 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    175 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Parmer Lane (RM 734) at SH45 Intersection

The Parmer Lane (RM 734) at SH45 Intersection project in Georgetown involves the addition of right and left turn lanes and the reconstruction of sidewalks. This renovation and alteration work is estimated at $5,165,000 and is registered with TDLR. The project is targeted for December 2026, with construction scheduled to begin in June 2026.

Project Scope and Location

Located in the Avery Ranch-Lakeline area of Williamson County, the site sits at the intersection of Parmer Lane and State Highway 45. The work focuses on traffic flow improvements through new turn lanes and pedestrian safety via new sidewalks. The filing lists the square footage as 1 sq ft, reflecting the linear nature of the roadway and sidewalk improvements rather than a building footprint.

TxDOT is the owner of record for this Federally funded roadway project. Alfred Benesch and Company serves as the design firm of record. Jesus E Lardizabal is the registered accessibility specialist associated with the filing. The project was registered with TDLR in November 2025, and plan review is pending.

Context and Comparison

The estimated cost of $5,165,000 is above the county median for renovation and alteration filings in Williamson County. The scheduled build window of 175 days is longer than the county median of 92 days for similar projects. TxDOT has six other TDLR-registered projects totaling $27,741,834 in the region, including facilities in Henderson and Marlin.

Georgetown, ZIP 78717, has a population of about 36,085 with a median household income of $140,483 according to U.S. Census ACS 2023 five-year estimates. The area includes nearby businesses such as Trek Bicycle Parmer and Parmer Eye Care. Williamson County unemployment rate was 4.1 percent in July 2026, higher than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78717 (Georgetown)

One email per change. Unsubscribe in one click. Privacy.

Parmer Lane (RM 734) at SH45 Intersection is a Renovation/Alteration project located at Parmer Lane (RM 734) at SH45 Intersection, Georgetown, TX 78717 in Georgetown, Texas. The project has an estimated value of $5.2M covering 1 sq ft. TxDOT is the property owner and Alfred Benesch and Company is the design firm of record. The project was registered with TDLR on November 12, 2025.

Frequently Asked Questions

What is being built at Parmer Lane and SH45?

Right and left turn lanes are being added at the intersection, and sidewalks are being reconstructed. The work is a renovation and alteration project registered with TDLR.

When will construction start and finish?

Construction is scheduled to start in June 2026. The project is targeted for December 2026, with plan review pending.

Who is the owner and designer?

TxDOT is the owner of record. Alfred Benesch and Company is the design firm of record for this Federally funded roadway project.

Is the site operational?

The TDLR record indicates the project is targeted for December 2026 and plan review is pending. The record does not state that the site is open or operating.

How does this project compare to others in Williamson County?

The cost is above the county median for renovation and alteration filings. The scheduled build window of 175 days is longer than the county median of 92 days.

What is Parmer Lane (RM 734) at SH45 Intersection?

Parmer Lane (RM 734) at SH45 Intersection is a renovation/alteration project at Parmer Lane (RM 734) at SH45 Intersection in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of right and left turn lanes at intersection and reconstruction of sidewalks.

Is Parmer Lane (RM 734) at SH45 Intersection open in Georgetown?

Parmer Lane (RM 734) at SH45 Intersection is still under construction in Georgetown, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Parmer Lane (RM 734) at SH45 Intersection located?

Parmer Lane (RM 734) at SH45 Intersection is located at Parmer Lane (RM 734) at SH45 Intersection, Georgetown, TX, 78717, in Williamson County.

Who is the owner or developer of Parmer Lane (RM 734) at SH45 Intersection?

TxDOT is the property owner/developer of record for Parmer Lane (RM 734) at SH45 Intersection, per its TDLR project registration.

Who is the architect or design firm for Parmer Lane (RM 734) at SH45 Intersection?

Alfred Benesch and Company is the design firm of record for Parmer Lane (RM 734) at SH45 Intersection, according to its TDLR filing.

How much does Parmer Lane (RM 734) at SH45 Intersection cost and how big is it?

Parmer Lane (RM 734) at SH45 Intersection has an estimated construction value of $5.2M and approximately 1 square feet (about $5165.00K/sqft), based on its TDLR filing.

Scope of Work

Addition of right and left turn lanes at intersection and reconstruction of sidewalks.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Parmer Lane (RM 734) at SH45 Intersection, Georgetown, TX, 78717

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78717 (Georgetown)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Georgetown?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.