Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Central City storm Sewer Improvements in Houston, TX
2800 Lockett St, Houston, TX, 77021
Central City storm Sewer Improvements is a renovation/alteration project at 2800 Lockett St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.0M across about 3,600 sq ft.
- Estimated project value
- $4.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.11K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
31 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
27 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
151 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Central City storm Sewer Improvements
The Central City Subdivision project in Houston involves the installation of new storm sewer pipes, manholes, inlets, and water lines within the City right of way. Registered under the name Central City storm Sewer Improvements, this renovation is located at 2800 Lockett St in the Medical Center Area. The City of Houston is the owner of record, and the project is estimated to cost $4,000,000.
The scope of work covers approximately 3,600 sq ft of infrastructure upgrades, including concrete pavement, sidewalks, driveways, and 3,600 sq yards of 4 1/2-inch reinforced concrete sidewalk. Halff Associates, Inc serves as the design firm of record for this initiative. The registered accessibility specialist for the project is Kathy S Rodriguez.
Project Status and Timeline
TDLR completed plan review in December 2025, with construction scheduled to begin in January 2026 and finish in June 2026. The filing indicates that this project involves public funds and public land. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection, meaning the current state of the site is not confirmed in the public record.
Compared to other renovation and alteration filings in Harris County, this project’s estimated cost is above the county median of $250,000. The scheduled build window of 151 days is longer than the county median of 92 days. The cost per square foot is listed as $1111, which is above the county median of $80 per square foot.
The City of Houston has one other TDLR-registered project totaling $5,000,000, known as Quitman road. Halff Associates, Inc has six other registered projects totaling $38,086,805, including work on Brays Bayou and Brookglen Subdivision. Nearby registered projects include the MD Anderson Cancer Center and The Woman's Hospital of Texas, both undergoing renovation or alteration work.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77021 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Central City storm Sewer Improvements is a Renovation/Alteration project located at 2800 Lockett St, Houston, TX 77021 in Houston, Texas. The project has an estimated value of $4.0M covering 3,600 sq ft. city of Houston is the property owner and Halff Associates, Inc is the design firm of record. The project was registered with TDLR on November 14, 2025.
Frequently Asked Questions
What is the estimated cost of this project?
The estimated cost for the Central City Subdivision project is $4,000,000. This figure is derived from the TDLR filing and is above the median cost for similar renovation projects in Harris County.
Who is the design firm for this project?
Halff Associates, Inc is the design firm of record for the Central City Subdivision project. They are responsible for the design aspects of the storm sewer and pavement improvements.
Is the project complete?
TDLR has not yet recorded a final inspection. While the scheduled completion date was June 2026, the public record does not confirm that the work has been finished and inspected.
What is the scope of work?
The work includes installing new storm sewer pipes, manholes, inlets, water lines, concrete pavement, sidewalks, driveways, and 3,600 sq yards of reinforced concrete sidewalk within the City right of way.
Where is the project located?
The project is located at 2800 Lockett St, Houston, TX 77021, in the Medical Center Area of Harris County.
What is Central City storm Sewer Improvements?
Central City storm Sewer Improvements is a renovation/alteration project at 2800 Lockett St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of new storm sewer pipes, manholes, inlets, water lines, concrete pavement, sidewalk, driceways and related appurtenances within City right of way approx 3600 sq yards of 4 1/2-in reinforced concrete sidewalf
Is Central City storm Sewer Improvements open in Houston?
Central City storm Sewer Improvements was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Central City storm Sewer Improvements located?
Central City storm Sewer Improvements is located at 2800 Lockett St, Houston, TX, 77021, in Harris County.
Who is the owner or developer of Central City storm Sewer Improvements?
city of Houston is the property owner/developer of record for Central City storm Sewer Improvements, per its TDLR project registration.
Who is the architect or design firm for Central City storm Sewer Improvements?
Halff Associates, Inc is the design firm of record for Central City storm Sewer Improvements, according to its TDLR filing.
How much does Central City storm Sewer Improvements cost and how big is it?
Central City storm Sewer Improvements has an estimated construction value of $4.0M and approximately 3,600 square feet (about $1.11K/sqft), based on its TDLR filing.
Scope of Work
Installation of new storm sewer pipes, manholes, inlets, water lines, concrete pavement, sidewalk, driceways and related appurtenances within City right of way approx 3600 sq yards of 4 1/2-in reinforced concrete sidewalf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2800 Lockett St, Houston, TX, 77021
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77021 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.