Spec Suite, Level 36
Spec Suite, Level 36 is a renovation/alteration project at 909 Fannin Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.5M across about 15,887 sq ft.
๐Project Metrics
TDLR #TABS2026006262Review Complete
Design review complete, construction may proceed
Spec Suite, Level 36 is a Renovation/Alteration project located at 909 Fannin Street, Houston, TX 77010 in Houston, Texas. The project has an estimated value of $1.5M covering 15,887 sq ft. SRC Houston Center 2 HC Owner, LLC is the property owner and Gensler is the design firm of record. The project was registered with TDLR on November 19, 2025.
โFrequently Asked Questions
What is Spec Suite, Level 36?
Spec Suite, Level 36 is a renovation/alteration project at 909 Fannin Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing interior tenant space.
Is Spec Suite, Level 36 open in Houston?
Spec Suite, Level 36 is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is Spec Suite, Level 36 located?
Spec Suite, Level 36 is located at 909 Fannin Street, Houston, TX, 77010, in Harris County.
Who is the owner or developer of Spec Suite, Level 36?
SRC Houston Center 2 HC Owner, LLC is the property owner/developer of record for Spec Suite, Level 36, per its TDLR project registration.
Who is the architect or design firm for Spec Suite, Level 36?
Gensler is the design firm of record for Spec Suite, Level 36, according to its TDLR filing.
How much does Spec Suite, Level 36 cost and how big is it?
Spec Suite, Level 36 has an estimated construction value of $1.5M and approximately 15,887 square feet (about $98/sqft), based on its TDLR filing.
๐Scope of Work
Renovation to existing interior tenant space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 19, 2025
Review Complete
Nov 19, 2025
Inspection Complete
Closed