City of Round Rock Fire Station No. 11
125 Seton Parkway, Round Rock, TX, 78665
City of Round Rock Fire Station No. 11 is a new construction project at 125 Seton Parkway, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $10.6M across about 15,262 sq ft.
- Estimated project value
- $10.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 15,262 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $692/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
23 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
110 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
455 days after the preceding date shown.
Source: TDLR filing
View source record
📰About City of Round Rock Fire Station No. 11
The City of Round Rock is constructing Fire Station No. 11 at 125 Seton Parkway in Williamson County. This new 15,262 sq ft facility is scheduled to finish in June 2027, with construction work starting in April 2026. The project is registered with the Texas Department of Licensing and Regulation under the name City of Round Rock Fire Station No. 11.
McKinney York Architects serves as the design firm of record for this project. A document posted by the City of Round Rock describes an agreement for architectural services submitted by the firm. The registered accessibility specialist for the filing is Mark S Robinson. The site is located in the Seton Network area, within the 78665 ZIP code.
Project Scope and Cost
The estimated cost for the new construction is $10,560,000. This figure works out to $692 per square foot. In Williamson County, the median estimated cost for similar new construction filings is $850,000, and the median size is 9,014 sq ft. This project’s cost is above the county median for its type, placing it in the top quarter of filings. The scheduled build window of 455 days is longer than the county median of 245 days.
The City of Round Rock has six other TDLR-registered projects totaling $35,741,415. These include the Heritage Trail and Parkside Circle Sidewalks. McKinney York Architects has six other registered projects totaling $14,891,948, including the Dinosaur Trackways Building in Austin. The project involves public funds and public land.
Location and Status
The area profile for ZIP 78665 shows a population of about 64,087 and a median household income of $117,240. Median owner-occupied home value is $438,700. Businesses near the site include Capital Surgeons Group and various medical practices. The Williamson County unemployment rate was 4.1 percent in July 2026, higher than a year earlier.
TDLR completed plan review in December 2025. The status is Review Complete. Construction is scheduled to finish in June 2027. The project is a one-off new construction for the city, distinct from nearby renovations like the Round Rock Premium Outlets.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78665 (Round Rock)
One email per change. Unsubscribe in one click. Privacy.
City of Round Rock Fire Station No. 11 is a New Construction project located at 125 Seton Parkway, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $10.6M covering 15,262 sq ft. City of Round Rock is the property owner and McKinney York Architects is the design firm of record. The project was registered with TDLR on November 19, 2025.
Frequently Asked Questions
When is Fire Station No. 11 scheduled to finish?
Construction is scheduled to finish in June 2027. Work is expected to start in April 2026. TDLR completed plan review in December 2025.
Who is designing the new fire station?
McKinney York Architects is the design firm of record. The registered accessibility specialist is Mark S Robinson.
What is the estimated cost of the project?
The estimated cost is $10,560,000. This is $692 per square foot for the 15,262 sq ft building.
Where is the fire station located?
The address is 125 Seton Parkway, Round Rock, TX 78665. It is in Williamson County, within the Seton Network area.
Is the fire station open to the public?
The project is under construction. The TDLR record indicates it is scheduled to finish in June 2027. It is not yet open.
What is City of Round Rock Fire Station No. 11?
City of Round Rock Fire Station No. 11 is a new construction project at 125 Seton Parkway in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 15,262 SF
Is City of Round Rock Fire Station No. 11 open in Round Rock?
City of Round Rock Fire Station No. 11 is still under construction in Round Rock, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is City of Round Rock Fire Station No. 11 located?
City of Round Rock Fire Station No. 11 is located at 125 Seton Parkway, Round Rock, TX, 78665, in Williamson County.
Who is the owner or developer of City of Round Rock Fire Station No. 11?
City of Round Rock is the property owner/developer of record for City of Round Rock Fire Station No. 11, per its TDLR project registration.
Who is the architect or design firm for City of Round Rock Fire Station No. 11?
McKinney York Architects is the design firm of record for City of Round Rock Fire Station No. 11, according to its TDLR filing.
How much does City of Round Rock Fire Station No. 11 cost and how big is it?
City of Round Rock Fire Station No. 11 has an estimated construction value of $10.6M and approximately 15,262 square feet (about $692/sqft), based on its TDLR filing.
Scope of Work
15,262 SF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
125 Seton Parkway, Round Rock, TX, 78665
Related Projects
Same Owner
$912.7M totalRelated City Permits
Building permits found at or near this location
Excavate 25 tunnel to repair main drain line under house
Addition- Construction of workshop attached by a breezeway
Emergency-replace underground wiring from pull box over to ct
Lexington / Irrigation for new landscape
Lexington Parke / Irrigation for new landscape
Watch all construction in 78665 (Round Rock)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Round Rock?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.