Project intelligenceTDLR TABS2026006632New Construction
Funding type

This project is privately funded, on private land for private use.

MARLOW FUEL CENTER in Dallas, TX

2105 SILVARADO DR., Dallas, TX, 75253

Opening ~Nov 2026Review Complete

MARLOW FUEL CENTER is a new construction project at 2105 SILVARADO DR., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $3.0M across about 10,225 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,225 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$293/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 9mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 1, 2025638 days across supplied datesNov 1, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    296 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    342 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About MARLOW FUEL CENTER

A new 10,225-square-foot fuel center and convenience store is rising at 2105 Silvarado Dr. in Dallas, Texas. This private construction project, registered with TDLR under the name Marlow Fuel Center, is scheduled to finish in November 2026.

The project is a new construction effort funded privately on private land for private use. The estimated cost is $3,000,000, which works out to $293 per square foot. This cost per square foot is above the county median of $125 for similar new construction filings in Dallas County. The total estimated cost is also above the county median of $950,000 for this type of work.

Design and Construction Details

Craddock Architecture PLLC is the design firm of record for this project. The registered accessibility specialist is Jeffrey A Gutknecht. The owner of record is Marlow Carl Thomas. Work began in February 2025, and TDLR completed plan review in November 2025. The current status is Review Complete, with the project scheduled to finish in November 2026.

The scheduled build window is 638 days, which is longer than the county median of 243 days for comparable projects. This extended timeline reflects the scale of the new fuel center and C-store combination. The area profile for ZIP code 75253 indicates a population of about 23,822 residents and a median household income of $56,519, based on U.S. Census estimates.

Craddock Architecture PLLC has six other TDLR-registered projects totaling $10,920,000, including locations in Allen, Rockwall, Royse City, Georgetown, and Graham. These projects range in cost from $100,000 to $9,000,000 and cover various commercial and educational facilities. The Marlow Fuel Center project stands out for its specific focus on fuel and convenience retail in a suburban Dallas setting.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75253 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

MARLOW FUEL CENTER is a New Construction project located at 2105 SILVARADO DR., Dallas, TX 75253 in Dallas, Texas. The project has an estimated value of $3.0M covering 10,225 sq ft. MARLOW CARL THOMAS is the property owner and CRADDOCK ARCHITECTURE PLLC is the design firm of record. The project was registered with TDLR on November 24, 2025.

Frequently Asked Questions

What is the estimated cost of the Marlow Fuel Center project?

The estimated cost is $3,000,000. This figure is above the Dallas County median of $950,000 for new construction projects of this type.

When is the construction scheduled to finish?

The project is scheduled to finish in November 2026. Work started in February 2025, and TDLR completed plan review in November 2025.

Who is the design firm for this project?

Craddock Architecture PLLC is the design firm of record. They are responsible for the architectural plans for the new fuel center and convenience store.

Is the Marlow Fuel Center open for business?

The TDLR record indicates the project is under construction and scheduled to finish in November 2026. It is not listed as open or operating in the construction filings.

Where is the Marlow Fuel Center located?

The project is located at 2105 Silvarado Dr. in Dallas, Texas 75253.

What is MARLOW FUEL CENTER?

MARLOW FUEL CENTER is a new construction project at 2105 SILVARADO DR. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW FUEL CENTER C STORE

Is MARLOW FUEL CENTER open in Dallas?

MARLOW FUEL CENTER is still under construction in Dallas, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is MARLOW FUEL CENTER located?

MARLOW FUEL CENTER is located at 2105 SILVARADO DR., Dallas, TX, 75253, in Dallas County.

Who is the owner or developer of MARLOW FUEL CENTER?

MARLOW CARL THOMAS is the property owner/developer of record for MARLOW FUEL CENTER, per its TDLR project registration.

Who is the architect or design firm for MARLOW FUEL CENTER?

CRADDOCK ARCHITECTURE PLLC is the design firm of record for MARLOW FUEL CENTER, according to its TDLR filing.

How much does MARLOW FUEL CENTER cost and how big is it?

MARLOW FUEL CENTER has an estimated construction value of $3.0M and approximately 10,225 square feet (about $293/sqft), based on its TDLR filing.

Scope of Work

NEW FUEL CENTER C STORE

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2105 SILVARADO DR., Dallas, TX, 75253

Location by street address

Watch all construction in 75253 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.