Taylard Brewing Co is a additions to existing building project at 1033 Imperial Blvd, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $400K across about 4,800 sq ft.
Design review complete, construction may proceed
Taylard Brewing Co is a Additions to Existing Building project located at 1033 Imperial Blvd, Sugar Land, TX 77498 in Sugar Land, Texas. The project has an estimated value of $400K covering 4,800 sq ft. Three Little Birds Holdings, LLC is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on December 1, 2025.
Taylard Brewing Co is a additions to existing building project at 1033 Imperial Blvd in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New open air Pre-engineered metal building structure built over existing outdoor pickle ball court. Structural, Electrical and limited flat work only Approximately 4800sf
Taylard Brewing Co is currently under construction in Sugar Land, TX. Its current TDLR status is "Review Complete".
Taylard Brewing Co is located at 1033 Imperial Blvd, Sugar Land, TX, 77498, in Fort Bend County.
Three Little Birds Holdings, LLC is the property owner/developer of record for Taylard Brewing Co, per its TDLR project registration.
Method Architecture is the design firm of record for Taylard Brewing Co, according to its TDLR filing.
Taylard Brewing Co has an estimated construction value of $400K and approximately 4,800 square feet (about $83/sqft), based on its TDLR filing.
New open air Pre-engineered metal building structure built over existing outdoor pickle ball court. Structural, Electrical and limited flat work only Approximately 4800sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 1, 2025
Review Complete
Dec 15, 2025
Inspection Complete
Closed
14d
Review duration