Project intelligenceTDLR TABS2026006940Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Spec Suite 700 in Dallas, TX

8350 North Central Expressway Suite 700, Dallas, TX, 75206

Target date passed (Apr 2026)Review Complete

Spec Suite 700 is a renovation/alteration project at 8350 North Central Expressway Suite 700, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $185K across about 2,564 sq ft.

Estimated project value
$185K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,564 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$72/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 1, 2025150 days across supplied datesApr 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    44 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    106 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Spec Suite 700

The Gild North renovation project is located at 8350 North Central Expressway Suite 700 in Dallas, Texas. This specific filing, registered under the name Spec Suite 700, covers an interior renovation of existing office space within a high-rise building. The project encompasses 2,564 square feet of work with an estimated cost of $185,000.

FCAW CC PropCo, LLC is listed as the owner of record for this development. The design firm of record is Go Studio, which is responsible for the project’s architectural and design aspects. The registered accessibility specialist for this TDLR filing is Jeffery L Kelley. The work is classified as a Renovation/Alteration of private office space on private land.

Project Timeline and Status

The project was registered with TDLR in December 2025, with construction scheduled to start in the same month. The filing indicates a planned completion date of April 2026. Plan review was completed in January 2026. However, the public record shows that TDLR has not yet recorded a final inspection. Consequently, the current physical state of the site is not confirmed in the official registry.

In terms of cost efficiency, the project’s rate of $72 per square foot is close to the county median of $72 per square foot for similar renovation filings in Dallas County. The total estimated cost of $185,000 is below the county median of $249,000 for this type of work. The scheduled build window of 150 days is longer than the county median of 92 days for comparable projects.

FCAW CC PropCo, LLC has six other TDLR-registered projects, including The Gild South and The Gild South Tower, with a combined value of $2,286,443. Go Studio has designed six other registered projects, including locations in Plano and Austin, totaling $4,192,000. The project is situated in ZIP code 75206, where the U.S. Census estimates the population at about 38,795 and the median household income at $88,464.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75206 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Spec Suite 700 is a Renovation/Alteration project located at 8350 North Central Expressway Suite 700, Dallas, TX 75206 in Dallas, Texas. The project has an estimated value of $185K covering 2,564 sq ft. FCAW CC PropCo, LLC is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on December 1, 2025.

Frequently Asked Questions

Is The Gild North open for business?

The TDLR record does not confirm that the business is open. The status indicates that TDLR has not yet recorded a final inspection, so the site's operational status is not verified in the public record.

Who is the owner of The Gild North?

FCAW CC PropCo, LLC is the owner of record for this project. The design firm of record is Go Studio, and the registered accessibility specialist is Jeffery L Kelley.

What is the estimated cost of the renovation?

The estimated cost for the 2,564 square foot renovation is $185,000. This results in a cost of $72 per square foot, which is close to the Dallas County median for similar work.

When was the project registered with TDLR?

The project was registered with TDLR in December 2025. Plan review was completed in January 2026, and construction was scheduled to finish in April 2026.

What is Spec Suite 700?

Spec Suite 700 is a renovation/alteration project at 8350 North Central Expressway Suite 700 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in high rise building.

Is Spec Suite 700 open in Dallas?

Spec Suite 700 was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Spec Suite 700 located?

Spec Suite 700 is located at 8350 North Central Expressway Suite 700, Dallas, TX, 75206, in Dallas County.

Who is the owner or developer of Spec Suite 700?

FCAW CC PropCo, LLC is the property owner/developer of record for Spec Suite 700, per its TDLR project registration.

Who is the architect or design firm for Spec Suite 700?

Go Studio is the design firm of record for Spec Suite 700, according to its TDLR filing.

How much does Spec Suite 700 cost and how big is it?

Spec Suite 700 has an estimated construction value of $185K and approximately 2,564 square feet (about $72/sqft), based on its TDLR filing.

Scope of Work

Interior renovation of existing office space in high rise building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8350 North Central Expressway Suite 700, Dallas, TX, 75206

Location by street address

Watch all construction in 75206 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.