Project intelligenceTDLR TABS2026007032Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CHHS CTE Kitchen Reno in Colleyville, TX

5401 Heritage Ave, Colleyville, TX, 76034

Construction complete · Aug 2026Inspection Complete

CHHS CTE Kitchen Reno is a renovation/alteration project at 5401 Heritage Ave, Colleyville, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $2.2M across about 1,800 sq ft.

Estimated project value
$2.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.22K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 2, 2025626 days across supplied datesAug 20, 2027

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    136 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    84 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    372 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About CHHS CTE Kitchen Reno

Colleyville Heritage High School completed a $2,200,000 renovation of its Career and Technical Education (CTE) kitchen in Colleyville, Texas. The project, filed under the name CHHS CTE Kitchen Reno, involved the demolition and reconstruction of a 1,800 sq ft area at 5401 Heritage Ave. The work is finished, with the building passing its final TDLR accessibility inspection in August 2026.

Project Scope and Design

Grapevine/Colleyville ISD, the owner of record, engaged Huckabee as the design firm for this renovation and alteration project. The scope of work focused specifically on kitchen demo and reno, transforming the existing space to meet current standards. The registered accessibility specialist for the project was Ross A Thomas, ensuring compliance with state requirements during the planning and execution phases.

The financial scale of this project places it significantly above the median for similar work in the region. In Tarrant County, the median estimated cost for renovation and alteration filings is $250,000, while the median size is 3,900 sq ft. At $1,222 per square foot, this project exceeds the county median of $79 per square foot. The scheduled build window of 456 days is also longer than the county median of 92 days for similar filings, reflecting the complexity of the kitchen infrastructure involved.

Timeline and Status

The project was registered with TDLR in December 2025. Plan review was completed in April 2026, and construction began in May 2026 according to the filing. Although the original completion date on the filing was August 2027, the final inspection was passed in August 2026, indicating the work was completed ahead of the initial schedule. The TDLR status is now listed as Inspection Complete.

This project is part of a broader portfolio of work by Grapevine/Colleyville ISD, which has two other TDLR-registered projects totaling $1,238,297. One of these, Bearcreek Elementary in Euless, is also inspection complete. Huckabee, the design firm, has been involved in six other TDLR-registered projects, including large-scale renovations in Venus and Killeen, demonstrating their experience with educational infrastructure across Texas.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76034 (Colleyville)

One email per change. Unsubscribe in one click. Privacy.

CHHS CTE Kitchen Reno is a Renovation/Alteration project located at 5401 Heritage Ave, Colleyville, TX 76034 in Colleyville, Texas. The project has an estimated value of $2.2M covering 1,800 sq ft. Grapevine/Colleyville ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on December 2, 2025.

Frequently Asked Questions

Is the Colleyville Heritage High School kitchen renovation finished?

Yes, the project passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete and the work has been finalized.

Who is the owner of the Colleyville Heritage High School kitchen project?

The owner of record is Grapevine/Colleyville ISD, which also owns two other TDLR-registered projects in the area, including one in Euless.

What was the estimated cost of the kitchen renovation?

The estimated cost for the 1,800 sq ft kitchen renovation was $2,200,000, which is above the median cost for similar renovation projects in Tarrant County.

Who designed the Colleyville Heritage High School kitchen project?

Huckabee is the design firm of record for this project, which also includes other large educational facilities in Texas.

When did construction start and end for this project?

Construction started in May 2026, and the final inspection was passed in August 2026, completing the work ahead of the original August 2027 target.

What is CHHS CTE Kitchen Reno?

CHHS CTE Kitchen Reno is a renovation/alteration project at 5401 Heritage Ave in Colleyville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: kitchen demo/reno

Is CHHS CTE Kitchen Reno open in Colleyville?

Construction on CHHS CTE Kitchen Reno is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is CHHS CTE Kitchen Reno located?

CHHS CTE Kitchen Reno is located at 5401 Heritage Ave, Colleyville, TX, 76034, in Tarrant County.

Who is the owner or developer of CHHS CTE Kitchen Reno?

Grapevine/Colleyville ISD is the property owner/developer of record for CHHS CTE Kitchen Reno, per its TDLR project registration.

Who is the architect or design firm for CHHS CTE Kitchen Reno?

Huckabee is the design firm of record for CHHS CTE Kitchen Reno, according to its TDLR filing.

How much does CHHS CTE Kitchen Reno cost and how big is it?

CHHS CTE Kitchen Reno has an estimated construction value of $2.2M and approximately 1,800 square feet (about $1.22K/sqft), based on its TDLR filing.

Scope of Work

kitchen demo/reno

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5401 Heritage Ave, Colleyville, TX, 76034

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76034 (Colleyville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Colleyville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.