ICF is a renovation/alteration project at 9600 GREAT HILLS TRAIL #300E, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K across about 5,622 sq ft.
๐Project Metrics
TDLR #TABS2026007205Review Complete
Design review complete, construction may proceed
ICF is a Renovation/Alteration project located at 9600 GREAT HILLS TRAIL #300E, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $150K covering 5,622 sq ft. KORE GREAT HILLS PLAZA INC. C/O TRANSWESTERN is the property owner and Red Design Studios is the design firm of record. The project was registered with TDLR on December 4, 2025.
โFrequently Asked Questions
What is ICF?
ICF is a renovation/alteration project at 9600 GREAT HILLS TRAIL #300E in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of the demolition and finish out of a newly demised tenant suite. Suite occupancy classification and use group remains unchanged by the scope of this work.
Is ICF open in Austin?
ICF is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is ICF located?
ICF is located at 9600 GREAT HILLS TRAIL #300E, Austin, TX, 78759, in Travis County.
Who is the owner or developer of ICF?
KORE GREAT HILLS PLAZA INC. C/O TRANSWESTERN is the property owner/developer of record for ICF, per its TDLR project registration.
Who is the architect or design firm for ICF?
Red Design Studios is the design firm of record for ICF, according to its TDLR filing.
How much does ICF cost and how big is it?
ICF has an estimated construction value of $150K and approximately 5,622 square feet (about $27/sqft), based on its TDLR filing.
๐Scope of Work
This project consists of the demolition and finish out of a newly demised tenant suite. Suite occupancy classification and use group remains unchanged by the scope of this work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 4, 2025
Review Complete
Dec 12, 2025
Inspection Complete
Closed
8d
Review duration
๐Related Projects
๐คSame Owner
$2.3M total๐๏ธSame Design Firm
$52.7M total๐Related City Permits
Building permits found at or near this location
Level 2 EV Charger powered by a 50amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <40 feet New 3/4 EMT conduit to power the Level 2 EV Charger at 40amp constant draw.
Disconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size. 5.22kW system
Replacement of existing exterior grease interceptor with a new 1000-gallon City of Austin approved unit in the same location. Like-for-like replacement no re-routing or extension of pipelines and no change to fixture count. Performed under Austin Water Industrial Waste Approval No. 2026-079402-00. Existing interceptor failed Austin Water inspection on 8/11/2025; replacement required by 8/11/2026.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (22320 SF)
Compass 92J14057 Wall Sign (front lit channel letter on support frame)