Telephone Road Improvements Phase 1 in Melissa, TX

Telephone Rd from Melissa Rd to Sunset Canyon Dr, Melissa, TX, 75454

Opening ~Nov 2026Review Complete

Telephone Road Improvements Phase 1 is a new construction project at Telephone Rd from Melissa Rd to Sunset Canyon Dr, Melissa, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $4.0M across about 3,000 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.33K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 4, 2025361 days across supplied datesNov 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    302 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Telephone Road Improvements Phase 1

Telephone Road Improvements Phase 1 involves the construction of approximately 3,000 linear feet of new 2-lane concrete roadway along Telephone Road, stretching from Melissa Road to Sunset Canyon Drive. This infrastructure project includes a 10-foot-wide concrete trail on the east side of the road, designed to improve local connectivity and pedestrian safety in the growing community. The total estimated cost for this construction effort is $4,000,000.

TDLR completed plan review in December 2025 and construction is scheduled to finish in November 2026, with work starting February 2026. The project is registered with the Texas Department of Licensing and Regulation, ensuring compliance with state accessibility standards for public facilities. The registered accessibility specialist for this filing is Casey Joe Anderson, who oversees the integration of accessible design elements into the roadway and trail.

Design and Construction Scope

Teague Nall & Perkins, Inc. serves as the design firm of record, responsible for the engineering and planning of the improvements. The scope involves new construction rather than renovation, creating a fresh concrete surface for both vehicular and pedestrian use. The project utilizes public funds and involves public land, reflecting the City of Melissa's commitment to maintaining and expanding its local transportation network. The estimated cost per square foot is $1333, a figure derived from the total budget and the 3,000 square feet of designated project area.

In the context of Collin County, this project is notable for its scale. The estimated cost is above the county median for similar new construction filings, placing it in the top quarter of recent projects. The scheduled build window of 302 days is longer than the county median of 212 days, indicating a complex construction timeline. The cost per square foot is also above the county median of $120, reflecting the specialized nature of roadway and trail construction.

The City of Melissa is the owner of record, which has six other TDLR-registered projects totaling $45,159,192. These include the East Water Facility, Melissa Lake Park, and Melissa City Hall. Teague Nall & Perkins, Inc. has two other registered projects, including the City of Van Alstyne Senior Center. The area surrounding the project, ZIP code 75454, has a population of about 20,137 and a median household income of $135,556 according to U.S. Census estimates. This infrastructure investment supports the residential and commercial growth in this predominantly owner-occupied community.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75454 (Melissa)

One email per change. Unsubscribe in one click. Privacy.

Telephone Road Improvements Phase 1 is a New Construction project located at Telephone Rd from Melissa Rd to Sunset Canyon Dr, Melissa, TX 75454 in Melissa, Texas. The project has an estimated value of $4.0M covering 3,000 sq ft. City of Melissa is the property owner and Teague Nall & Perkins, Inc is the design firm of record. The project was registered with TDLR on December 4, 2025.

Frequently Asked Questions

When will the Telephone Road improvements be finished?

Construction is scheduled to finish in November 2026. Work is set to start in February 2026, following the completion of plan review in December 2025.

Who is building the new roadway and trail?

The City of Melissa is the owner of record. Teague Nall & Perkins, Inc. is the design firm. Casey Joe Anderson is the registered accessibility specialist.

What is the estimated cost of the project?

The estimated cost is $4,000,000. This covers approximately 3,000 linear feet of 2-lane concrete roadway and a 10-foot-wide concrete trail.

Is the project currently open to the public?

The project is under construction. It is not open for use until the construction phase is complete, which is scheduled for November 2026.

Where exactly is the construction taking place?

The work is located on Telephone Road from Melissa Road to Sunset Canyon Drive in Melissa, Texas, 75454. The trail will be on the east side of the road.

What is Telephone Road Improvements Phase 1?

Telephone Road Improvements Phase 1 is a new construction project at Telephone Rd from Melissa Rd to Sunset Canyon Dr in Melissa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct approximately 3,000 LF of 2-lane concrete roadway with a 10' wide concrete trail along the east side of the road.

Is Telephone Road Improvements Phase 1 open in Melissa?

Telephone Road Improvements Phase 1 is still under construction in Melissa, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is Telephone Road Improvements Phase 1 located?

Telephone Road Improvements Phase 1 is located at Telephone Rd from Melissa Rd to Sunset Canyon Dr, Melissa, TX, 75454, in Collin County.

Who is the owner or developer of Telephone Road Improvements Phase 1?

City of Melissa is the property owner/developer of record for Telephone Road Improvements Phase 1, per its TDLR project registration.

Who is the architect or design firm for Telephone Road Improvements Phase 1?

Teague Nall & Perkins, Inc is the design firm of record for Telephone Road Improvements Phase 1, according to its TDLR filing.

How much does Telephone Road Improvements Phase 1 cost and how big is it?

Telephone Road Improvements Phase 1 has an estimated construction value of $4.0M and approximately 3,000 square feet (about $1.33K/sqft), based on its TDLR filing.

Scope of Work

Construct approximately 3,000 LF of 2-lane concrete roadway with a 10' wide concrete trail along the east side of the road.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Telephone Rd from Melissa Rd to Sunset Canyon Dr, Melissa, TX, 75454

Location by street address

Watch all construction in 75454 (Melissa)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.