Project intelligenceTDLR TABS2026007650Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2024 Mill & Overlay Program, PWSM24006 in Arlington, TX

Various streets in Arlington, Arlington, TX, 76010

Construction complete · Aug 2026Project Closed

2024 Mill & Overlay Program, PWSM24006 is a renovation/alteration project at Various streets in Arlington, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $61K across about 42,500 sq ft.

Estimated project value
$61K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
42,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 1, 2024622 days across supplied datesAug 15, 2026

6 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    374 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    12 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    203 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 2024 Mill & Overlay Program, PWSM24006

The City of Arlington completed the 2024 Mill & Overlay Program, identified in TDLR filings as PWSM24006, which involved resurfacing various streets within the city. This renovation project covered approximately 42,500 square feet of sidewalk and ADA ramp replacement, with an estimated total cost of $61,300. The work was registered with the Texas Department of Licensing and Regulation in December 2025, following a construction start date of December 2024 as noted in the original filing.

The scope of work focused on public infrastructure improvements, specifically the application of a new two-inch asphalt overlay and the replacement of sidewalks and ADA ramps. The project utilized public funds and was conducted on public land, consistent with its status as a Federally funded roadway project. The estimated cost of $1 per square foot is notably below the median of $79 per square foot for similar renovation and alteration projects in Tarrant County, where the median estimated cost is $250,000.

Project Timeline and Status

Plan review was completed in December 2025, aligning with the registration date. The filing indicated a scheduled completion date of December 2025, which has passed. Construction started in December 2024, resulting in a scheduled build window of 395 days, a duration longer than the 92-day median for comparable projects in the county. The final inspection was passed in January 2026, confirming the completion of the physical work.

TDLR closed the project file in August 2026, which marks the end of the accessibility review process for this construction. This closure signifies that all required reviews and inspections have been satisfied, and the project is officially concluded in the state’s regulatory records. The City of Arlington, TX, is the owner of record, and this project is one of two TDLR-registered projects for the city, the other totaling $2,000,000.

The project took place in ZIP code 76010, a community with a population of about 55,610 and a median household income of $43,811, according to U.S. Census ACS 2023 five-year estimates. The area includes 20,508 housing units, with a median owner-occupied home value of $199,200. These demographic details provide context for the location of the infrastructure improvements, which benefit residents and visitors navigating the city’s streets.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76010 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

2024 Mill & Overlay Program, PWSM24006 is a Renovation/Alteration project located at Various streets in Arlington, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $61K covering 42,500 sq ft. City of Arlington, TX is the property owner. The project was registered with TDLR on December 10, 2025.

Frequently Asked Questions

Is the project open to the public?

The TDLR record indicates the construction is complete and the file is closed. It does not specify if the streets are open to traffic, as that is determined by the City of Arlington.

What was the total cost of the project?

The estimated cost for the 2024 Mill & Overlay Program was $61,300. This figure covers the resurfacing of streets and the replacement of sidewalks and ADA ramps.

When was the final inspection passed?

The final inspection was passed in January 2026. This date confirms that the physical construction work was completed and verified by the relevant authorities.

Who owns the project?

The City of Arlington, TX, is the owner and developer of record for this project. It is a public infrastructure improvement funded by public and federal sources.

How long did the construction take?

The scheduled build window was 395 days, starting in December 2024. This duration is longer than the 92-day median for similar renovation projects in Tarrant County.

What is 2024 Mill & Overlay Program, PWSM24006?

2024 Mill & Overlay Program, PWSM24006 is a renovation/alteration project at Various streets in Arlington in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Various streets resurfaced with a new 2" asphalt overlay and sidewalk & ADA ramp replacement. Sidewalk replaced = 42,500 SF (approx.)

Is 2024 Mill & Overlay Program, PWSM24006 open in Arlington?

Construction on 2024 Mill & Overlay Program, PWSM24006 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is 2024 Mill & Overlay Program, PWSM24006 located?

2024 Mill & Overlay Program, PWSM24006 is located at Various streets in Arlington, Arlington, TX, 76010, in Tarrant County.

Who is the owner or developer of 2024 Mill & Overlay Program, PWSM24006?

City of Arlington, TX is the property owner/developer of record for 2024 Mill & Overlay Program, PWSM24006, per its TDLR project registration.

How much does 2024 Mill & Overlay Program, PWSM24006 cost and how big is it?

2024 Mill & Overlay Program, PWSM24006 has an estimated construction value of $61K and approximately 42,500 square feet (about $1/sqft), based on its TDLR filing.

Scope of Work

Various streets resurfaced with a new 2" asphalt overlay and sidewalk & ADA ramp replacement. Sidewalk replaced = 42,500 SF (approx.)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various streets in Arlington, Arlington, TX, 76010

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related Projects

Watch all construction in 76010 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Arlington?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.