Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Frost ISD PK-8 Addition
208 North Wyrick Street, Frost, TX, 76641
Frost ISD PK-8 Addition is a new construction project at 208 North Wyrick Street, Frost, in Navarro County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $18.6M across about 29,343 sq ft.
- Estimated project value
- $18.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 29,343 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $635/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
142 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
92 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Frost ISD PK-8 Addition
Frost Public Schools has registered a new construction project with TDLR to build a 29,343 sq ft Pre-K through 8th Grade campus at 208 North Wyrick Street in Frost, Navarro County. The filing, titled Frost ISD PK-8 Addition, lists an estimated cost of $18,622,310. This project involves public funds and public land, and Corgan is the design firm of record.
The registered accessibility specialist for the project is Ronald L Davis. The filing indicates a construction start date of May 2026 and a target completion date of August 2026. However, the project was registered in December 2025, and no plan review or inspection has been recorded since, so whether it proceeded is not confirmed in the public record.
Project Scope and Costs
The scope of work includes a new construction and addition to the existing campus to house students from Pre-K to 8th Grade. The estimated cost of $18,622,310 translates to approximately $635 per square foot. This figure is above the county median of $158 per square foot for new construction filings in Navarro County. The scheduled build window of 92 days is shorter than the county median of 182 days.
Corgan has six other TDLR-registered projects totaling $31,299,000. These include the Crosspoint Building 1 in Georgetown, valued at $25,000,000, and 1000 Louisiana in Houston, valued at $499,000.
Local Context
Frost is a small community in Navarro County with a population of about 2,094 according to U.S. Census ACS 2023 five-year estimates for ZIP 76641. The median household income is $74,205, and the median owner-occupied home value is $143,200. Housing in the area is predominantly owner-occupied. The Navarro County unemployment rate was 5.4 percent in July 2026, higher than a year earlier.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76641 (Frost)
One email per change. Unsubscribe in one click. Privacy.
Frost ISD PK-8 Addition is a New Construction project located at 208 North Wyrick Street in Frost, Texas. The project has an estimated value of $18.6M covering 29,343 sq ft. Frost ISD is the property owner and Corgan is the design firm of record. The project was registered with TDLR on December 10, 2025.
Frequently Asked Questions
What is the Frost ISD PK-8 Addition project?
It is a new 29,343 sq ft Pre-K through 8th Grade campus at 208 North Wyrick Street in Frost, registered with TDLR with an estimated cost of $18,622,310.
Who is the design firm for the Frost school project?
Corgan is the design firm of record for the Frost ISD PK-8 Addition project in Navarro County.
Is the Frost school project complete?
The filing targeted completion in August 2026, but no plan review or inspection has been recorded, so completion is not confirmed in the public record.
What is the estimated cost per square foot?
The estimated cost is $18,622,310 for 29,343 sq ft, which computes to approximately $635 per square foot.
What is Frost ISD PK-8 Addition?
Frost ISD PK-8 Addition is a new construction project at 208 North Wyrick Street in Frost, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction/addition to an existing campus to house Pre-K - 8th Grade (29,343 SF).
Is Frost ISD PK-8 Addition open in Frost?
Frost ISD PK-8 Addition was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Frost ISD PK-8 Addition located?
Frost ISD PK-8 Addition is located at 208 North Wyrick Street, Frost, TX, 76641, in Navarro County.
Who is the owner or developer of Frost ISD PK-8 Addition?
Frost ISD is the property owner/developer of record for Frost ISD PK-8 Addition, per its TDLR project registration.
Who is the architect or design firm for Frost ISD PK-8 Addition?
Corgan is the design firm of record for Frost ISD PK-8 Addition, according to its TDLR filing.
How much does Frost ISD PK-8 Addition cost and how big is it?
Frost ISD PK-8 Addition has an estimated construction value of $18.6M and approximately 29,343 square feet (about $635/sqft), based on its TDLR filing.
Scope of Work
New construction/addition to an existing campus to house Pre-K - 8th Grade (29,343 SF).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
208 North Wyrick Street, Frost, TX, 76641
Related Projects
Watch all construction in 76641 (Frost)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Frost?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.