QuikTrip #883 Fryer Project is a renovation/alteration project at 2949 Basswood Blvd., Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $125K across about 300 sq ft.
Final inspection completed, awaiting project closure
QuikTrip #883 Fryer Project is a Renovation/Alteration project located at 2949 Basswood Blvd., Fort Worth, TX 76131 in Fort Worth, Texas. The project has an estimated value of $125K covering 300 sq ft. QT South, LLC is the property owner and Daniel D. Filuk, Architect is the design firm of record. The project was registered with TDLR on December 11, 2025.
QuikTrip #883 Fryer Project is a renovation/alteration project at 2949 Basswood Blvd. in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reorganization of existing kitchen equipment and addition of new fryer units. 300 sf.
Construction on QuikTrip #883 Fryer Project is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
QuikTrip #883 Fryer Project is located at 2949 Basswood Blvd., Fort Worth, TX, 76131, in Tarrant County.
QT South, LLC is the property owner/developer of record for QuikTrip #883 Fryer Project, per its TDLR project registration.
Daniel D. Filuk, Architect is the design firm of record for QuikTrip #883 Fryer Project, according to its TDLR filing.
QuikTrip #883 Fryer Project has an estimated construction value of $125K and approximately 300 square feet (about $417/sqft), based on its TDLR filing.
Reorganization of existing kitchen equipment and addition of new fryer units. 300 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 11, 2025
Review Complete
Dec 15, 2025
Inspection Complete
Apr 23, 2026
Closed
4d
Review duration
129d
Construction phase