Project intelligenceTDLR TABS2026008186Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DISD Tasby Middle School - Renovation

7001 Fair Paks Ave, Dallas, TX, 75231

Opening ~Dec 2026Review Complete

DISD Tasby Middle School - Renovation is a renovation/alteration project at 7001 Fair Paks Ave, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $788K across about 150 sq ft.

Estimated project value
$788K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
150 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5.25K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 16, 2025364 days across supplied datesDec 15, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    301 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75231 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

DISD Tasby Middle School - Renovation is a Renovation/Alteration project located at 7001 Fair Paks Ave, Dallas, TX 75231 in Dallas, Texas. The project has an estimated value of $788K covering 150 sq ft. Dallas ISD is the property owner and KAI Design is the design firm of record. The project was registered with TDLR on December 16, 2025.

Frequently Asked Questions

What is DISD Tasby Middle School - Renovation?

DISD Tasby Middle School - Renovation is a renovation/alteration project at 7001 Fair Paks Ave in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate entry vestibule, new marquee sign, renovate small portion of exterior sidewalks. Vestibule is 150 SF.

Is DISD Tasby Middle School - Renovation open in Dallas?

DISD Tasby Middle School - Renovation is still under construction in Dallas, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is DISD Tasby Middle School - Renovation located?

DISD Tasby Middle School - Renovation is located at 7001 Fair Paks Ave, Dallas, TX, 75231, in Dallas County.

Who is the owner or developer of DISD Tasby Middle School - Renovation?

Dallas ISD is the property owner/developer of record for DISD Tasby Middle School - Renovation, per its TDLR project registration.

Who is the architect or design firm for DISD Tasby Middle School - Renovation?

KAI Design is the design firm of record for DISD Tasby Middle School - Renovation, according to its TDLR filing.

How much does DISD Tasby Middle School - Renovation cost and how big is it?

DISD Tasby Middle School - Renovation has an estimated construction value of $788K and approximately 150 square feet (about $5.25K/sqft), based on its TDLR filing.

Scope of Work

Renovate entry vestibule, new marquee sign, renovate small portion of exterior sidewalks. Vestibule is 150 SF.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7001 Fair Paks Ave, Dallas, TX, 75231

Location by street address

Watch all construction in 75231 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.