Project intelligenceTDLR TABS2026008327New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

The Boyd at Westover in Houston, TX

7311 Westover Street, Houston, TX, 77087

Opening ~May 2028Review Complete

The Boyd at Westover is a new construction project at 7311 Westover Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2028. The project has an estimated value of $1.4M across about 7,520 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,520 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$185/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 17, 2025866 days across supplied datesMay 1, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    209 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    110 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    547 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About The Boyd at Westover

The Boyd at Westover: New Community Building

The Boyd at Westover is a 7,520 sq ft, one-story community building located at 7311 Westover Street in Houston, Harris County. Registered with the Texas Department of Licensing and Regulation (TDLR) in December 2025, this new construction project represents a significant investment in the area. The Presbyterian Service Center is the owner of record, while GSMA, Inc serves as the design firm. John R Torkelson is the registered accessibility specialist overseeing the TABS compliance for the site.

The estimated cost for the project is $1,391,200, which calculates to $185 per square foot. This figure is above the county median of $88 per square foot for similar new construction filings in Harris County. The total project cost is also above the county median estimated cost of $750,000. The funding source involves public funds, public land, or is a Federally funded roadway project, indicating a public or federally supported initiative.

TDLR completed the plan review in November 2026, and construction is scheduled to finish in May 2028, with work starting July 2026. This scheduled build window of 657 days is longer than the county median of 224 days. The current TDLR status is listed as Review Complete.

Third-party sources have provided additional context regarding the scope of this development. A post by Columbiaresidential described The Boyd at Westover as a 144-unit apartment project for families in Southeast Houston. Similarly, an Instagram post and a Facebook post by KPRC2 referenced the project as adding 144 apartment homes to the community. These mentions suggest the facility may serve as affordable housing, though the TDLR filing specifically defines the scope as a community building.

GSMA, Inc has a history of projects in the region, with four other TDLR-registered projects totaling $42,817,054. These include the New Hope Housing Little York project in Houston and the Houston Area Women's Center project. The local area, ZIP code 77087, has a population of about 35,192 and a median household income of $53,624. The Harris County unemployment rate was 5 percent in August 2026, lower than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77087 (Houston)

One email per change. Unsubscribe in one click. Privacy.

The Boyd at Westover is a New Construction project located at 7311 Westover Street, Houston, TX 77087 in Houston, Texas. The project has an estimated value of $1.4M covering 7,520 sq ft. Presbyterian Service Center is the property owner and GSMA, Inc is the design firm of record. The project was registered with TDLR on December 17, 2025.

Frequently Asked Questions

What is the exact address of The Boyd at Westover?

The project is located at 7311 Westover Street, Houston, TX 77087, in Harris County.

Who is the owner of The Boyd at Westover?

The owner of record for this new construction project is the Presbyterian Service Center.

Is The Boyd at Westover open to the public?

The TDLR record covers construction only and does not record whether the business has started serving customers. Construction is scheduled to finish in May 2028.

What is the estimated cost of the project?

The estimated cost is $1,391,200 for the 7,520 sq ft building, which is $185 per square foot.

When does construction start and end?

Construction is scheduled to start in July 2026 and is scheduled to finish in May 2028.

What is The Boyd at Westover?

The Boyd at Westover is a new construction project at 7311 Westover Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1 Story Community Building, 7,520 SF

Is The Boyd at Westover open in Houston?

The Boyd at Westover is still under construction in Houston, TX, with an estimated completion of May 2028 according to its TDLR registration.

Where is The Boyd at Westover located?

The Boyd at Westover is located at 7311 Westover Street, Houston, TX, 77087, in Harris County.

Who is the owner or developer of The Boyd at Westover?

Presbyterian Service Center is the property owner/developer of record for The Boyd at Westover, per its TDLR project registration.

Who is the architect or design firm for The Boyd at Westover?

GSMA, Inc is the design firm of record for The Boyd at Westover, according to its TDLR filing.

How much does The Boyd at Westover cost and how big is it?

The Boyd at Westover has an estimated construction value of $1.4M and approximately 7,520 square feet (about $185/sqft), based on its TDLR filing.

Scope of Work

1 Story Community Building, 7,520 SF

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7311 Westover Street, Houston, TX, 77087

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77087 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.