Crosby ISD Sixth Grade Campus
202 Red Summit Dr, Crosby, TX, 77532
Crosby ISD Sixth Grade Campus is a new construction project at 202 Red Summit Dr, Crosby, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $37.0M across about 120,000 sq ft.
- Estimated project value
- $37.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 120,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $308/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
72 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
67 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
417 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Crosby ISD Sixth Grade Campus
The Crosby ISD Sixth Grade Campus is a new construction project located at 202 Red Summit Dr, Crosby, TX 77532. This two-story building will cover 120,000 square feet and is situated on 14 acres of land between Crosby Middle School and Crosby High School. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the accessibility standards program, with plan review completed in May 2026.
Crosby ISD, represented by Robert Heniff, is the owner of record for this development. Stantec Architecture Inc. serves as the design firm, bringing experience from other major projects including the Polytechnic Pyramid Middle School in Fort Worth. Laura Fulkerson is the registered accessibility specialist for this filing. The estimated cost for the project is $37,000,000, which translates to $308 per square foot.
Construction is scheduled to begin in March 2026 and is scheduled to finish in June 2027. This build window spans 484 days, which is longer than the county median of 219 days for similar new construction filings in Harris County. The project involves public funds and public land, reflecting the district's commitment to expanding its educational infrastructure in the area.
In Harris County, the median estimated cost for new construction projects is $750,000, with a median size of 9,000 square feet. This campus project is significantly larger and more expensive than those medians, placing it in the top quarter for cost within the county's recent filings. The median cost per square foot in the county is $88, whereas this project is estimated at $308 per square foot, reflecting the specialized nature of educational facilities.
The surrounding area, ZIP code 77532, has a population of about 31,778 people according to U.S. Census estimates. The median household income is $89,740, and the median owner-occupied home value is $243,700. Crosby ISD has one other TDLR-registered project, the Crosby ISD Admin Bldg Reno, which is valued at $6,500,000. This new campus represents a substantial investment in the district's facilities.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77532 (Crosby)
One email per change. Unsubscribe in one click. Privacy.
Crosby ISD Sixth Grade Campus is a New Construction project located at 202 Red Summit Dr, Crosby, TX 77532 in Crosby, Texas. The project has an estimated value of $37.0M covering 120,000 sq ft. Crosby ISD - Robert Heniff is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on December 19, 2025.
Frequently Asked Questions
When will construction start?
Construction is scheduled to start in March 2026, following the completion of plan review in May 2026.
Who is the design firm?
Stantec Architecture Inc. is the design firm of record for the Crosby ISD Sixth Grade Campus.
How large is the building?
The building is two stories and covers 120,000 square feet of space.
Where is the project located?
The project is located at 202 Red Summit Dr, Crosby, TX 77532, on 14 acres between two existing schools.
What is Crosby ISD Sixth Grade Campus?
Crosby ISD Sixth Grade Campus is a new construction project at 202 Red Summit Dr in Crosby, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The Crosby Sixth Grade Campus project will include a two-story, 100,000 square foot building. The Crosby Sixth Grade Campus will be located on 14 acres of land between Crosby Middle School and Crosby High School.
Is Crosby ISD Sixth Grade Campus open in Crosby?
Crosby ISD Sixth Grade Campus is still under construction in Crosby, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is Crosby ISD Sixth Grade Campus located?
Crosby ISD Sixth Grade Campus is located at 202 Red Summit Dr, Crosby, TX, 77532, in Harris County.
Who is the owner or developer of Crosby ISD Sixth Grade Campus?
Crosby ISD - Robert Heniff is the property owner/developer of record for Crosby ISD Sixth Grade Campus, per its TDLR project registration.
Who is the architect or design firm for Crosby ISD Sixth Grade Campus?
Stantec Architecture Inc. is the design firm of record for Crosby ISD Sixth Grade Campus, according to its TDLR filing.
How much does Crosby ISD Sixth Grade Campus cost and how big is it?
Crosby ISD Sixth Grade Campus has an estimated construction value of $37.0M and approximately 120,000 square feet (about $308/sqft), based on its TDLR filing.
Scope of Work
The Crosby Sixth Grade Campus project will include a two-story, 100,000 square foot building. The Crosby Sixth Grade Campus will be located on 14 acres of land between Crosby Middle School and Crosby High School.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
202 Red Summit Dr, Crosby, TX, 77532
Related Projects
Watch all construction in 77532 (Crosby)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Crosby?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.