Terminal C Facilities Space Centralization Project
3500 South Terminal Rd, Houston, TX, 77032
Terminal C Facilities Space Centralization Project is a renovation/alteration project at 3500 South Terminal Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.4M across about 17,000 sq ft.
- Estimated project value
- $5.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 17,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $318/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
46 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
16 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
150 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77032 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Terminal C Facilities Space Centralization Project is a Renovation/Alteration project located at 3500 South Terminal Rd, Houston, TX 77032 in Houston, Texas. The project has an estimated value of $5.4M covering 17,000 sq ft. City of Houston - Houston Airport System Division is the property owner and English + Associates Architects, Inc. is the design firm of record. The project was registered with TDLR on December 19, 2025.
Frequently Asked Questions
What is Terminal C Facilities Space Centralization Project?
Terminal C Facilities Space Centralization Project is a renovation/alteration project at 3500 South Terminal Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Buildout new office space and shop space in exterior lower ramp0 level storage area under concourse. This will include new restrooms, new breakroom, locker rooms, office space and shop areas. It will also include enclosing area for inter…
Is Terminal C Facilities Space Centralization Project open in Houston?
Terminal C Facilities Space Centralization Project was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Terminal C Facilities Space Centralization Project located?
Terminal C Facilities Space Centralization Project is located at 3500 South Terminal Rd, Houston, TX, 77032, in Harris County.
Who is the owner or developer of Terminal C Facilities Space Centralization Project?
City of Houston - Houston Airport System Division is the property owner/developer of record for Terminal C Facilities Space Centralization Project, per its TDLR project registration.
Who is the architect or design firm for Terminal C Facilities Space Centralization Project?
English + Associates Architects, Inc. is the design firm of record for Terminal C Facilities Space Centralization Project, according to its TDLR filing.
How much does Terminal C Facilities Space Centralization Project cost and how big is it?
Terminal C Facilities Space Centralization Project has an estimated construction value of $5.4M and approximately 17,000 square feet (about $318/sqft), based on its TDLR filing.
Scope of Work
Buildout new office space and shop space in exterior lower ramp0 level storage area under concourse. This will include new restrooms, new breakroom, locker rooms, office space and shop areas. It will also include enclosing area for interior space w
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3500 South Terminal Rd, Houston, TX, 77032
Related Projects
Watch all construction in 77032 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.