TREC
TREC is a renovation/alteration project at 3333 Lee Parkway Suite 200, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $300K across about 6,672 sq ft.
๐Project Metrics
TDLR #TABS2026008568Inspection Complete
Final inspection completed, awaiting project closure
TREC is a Renovation/Alteration project located at 3333 Lee Parkway Suite 200, Dallas, TX 75219 in Dallas, Texas. The project has an estimated value of $300K covering 6,672 sq ft. GPI Lee Parkway LP is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on December 19, 2025.
โFrequently Asked Questions
What is TREC?
TREC is a renovation/alteration project at 3333 Lee Parkway Suite 200 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in high rise building
Is TREC open in Dallas?
Construction on TREC is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is TREC located?
TREC is located at 3333 Lee Parkway Suite 200, Dallas, TX, 75219, in Dallas County.
Who is the owner or developer of TREC?
GPI Lee Parkway LP is the property owner/developer of record for TREC, per its TDLR project registration.
Who is the architect or design firm for TREC?
Go Studio is the design firm of record for TREC, according to its TDLR filing.
How much does TREC cost and how big is it?
TREC has an estimated construction value of $300K and approximately 6,672 square feet (about $45/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in high rise building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 19, 2025
Review Complete
Apr 3, 2026
Inspection Complete
Jun 20, 2026
Closed
105d
Review duration
78d
Construction phase