Elevator Lobby, Corridor and Restroom Remodel is a renovation/alteration project at 1980 Post Oak Boulevard Level 20, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $300K across about 1,649 sq ft.
Final inspection completed, awaiting project closure
Elevator Lobby, Corridor and Restroom Remodel is a Renovation/Alteration project located at 1980 Post Oak Boulevard Level 20, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $300K covering 1,649 sq ft. POC Partners 1 LLC is the property owner and Ziegler Cooper is the design firm of record. The project was registered with TDLR on December 19, 2025.
Elevator Lobby, Corridor and Restroom Remodel is a renovation/alteration project at 1980 Post Oak Boulevard Level 20 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing elevator lobby and restrooms
Construction on Elevator Lobby, Corridor and Restroom Remodel is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Elevator Lobby, Corridor and Restroom Remodel is located at 1980 Post Oak Boulevard Level 20, Houston, TX, 77056, in Harris County.
POC Partners 1 LLC is the property owner/developer of record for Elevator Lobby, Corridor and Restroom Remodel, per its TDLR project registration.
Ziegler Cooper is the design firm of record for Elevator Lobby, Corridor and Restroom Remodel, according to its TDLR filing.
Elevator Lobby, Corridor and Restroom Remodel has an estimated construction value of $300K and approximately 1,649 square feet (about $182/sqft), based on its TDLR filing.
Renovation of existing elevator lobby and restrooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 19, 2025
Review Complete
Jan 15, 2026
Inspection Complete
May 19, 2026
Closed
27d
Review duration
124d
Construction phase