Project intelligenceTDLR TABS2026008665Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BISD Elementary School Renovations

401 Elm Ave, Bryan, TX, 77801

Construction complete · Sep 2026Inspection Complete

BISD Elementary School Renovations is a renovation/alteration project at 401 Elm Ave, Bryan, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $600K across about 1,500 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$400/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 19, 2025263 days across supplied datesSep 8, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    73 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    129 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77801 (Bryan)

One email per change. Unsubscribe in one click. Privacy.

BISD Elementary School Renovations is a Renovation/Alteration project located at 401 Elm Ave, Bryan, TX 77801 in Bryan, Texas. The project has an estimated value of $600K covering 1,500 sq ft. BRYAN IND SCHOOL DISTRICT is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on December 19, 2025.

Frequently Asked Questions

What is BISD Elementary School Renovations?

BISD Elementary School Renovations is a renovation/alteration project at 401 Elm Ave in Bryan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE DEMOLITION OF SELECTED EXISTING INTERIOR WALLS, INSTALLATION OF NEW FINISHES AND FIXTURES AND NEW M.E.P.T. SYSTEMS

Is BISD Elementary School Renovations open in Bryan?

Construction on BISD Elementary School Renovations is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is BISD Elementary School Renovations located?

BISD Elementary School Renovations is located at 401 Elm Ave, Bryan, TX, 77801, in Brazos County.

Who is the owner or developer of BISD Elementary School Renovations?

BRYAN IND SCHOOL DISTRICT is the property owner/developer of record for BISD Elementary School Renovations, per its TDLR project registration.

Who is the architect or design firm for BISD Elementary School Renovations?

PBK Architects is the design firm of record for BISD Elementary School Renovations, according to its TDLR filing.

How much does BISD Elementary School Renovations cost and how big is it?

BISD Elementary School Renovations has an estimated construction value of $600K and approximately 1,500 square feet (about $400/sqft), based on its TDLR filing.

Scope of Work

THE DEMOLITION OF SELECTED EXISTING INTERIOR WALLS, INSTALLATION OF NEW FINISHES AND FIXTURES AND NEW M.E.P.T. SYSTEMS

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

401 Elm Ave, Bryan, TX, 77801