Project intelligenceTDLR TABS2026008818Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Mansfield ISD | Timberview High School - Tennis Court Resurfacing

7700 S. Watson Road, Arlington, TX, 76002

Opening ~Dec 2026Review Complete

Mansfield ISD | Timberview High School - Tennis Court Resurfacing is a renovation/alteration project at 7700 S. Watson Road, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $130K across about 1 sq ft.

Estimated project value
$130K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$130.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 22, 2025374 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    302 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76002 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

Mansfield ISD | Timberview High School - Tennis Court Resurfacing is a Renovation/Alteration project located at 7700 S. Watson Road, Arlington, TX 76002 in Arlington, Texas. The project has an estimated value of $130K covering 1 sq ft. Mansfield ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on December 22, 2025.

Frequently Asked Questions

What is Mansfield ISD | Timberview High School - Tennis Court Resurfacing?

Mansfield ISD | Timberview High School - Tennis Court Resurfacing is a renovation/alteration project at 7700 S. Watson Road in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Mansfield ISD | Timberview High School - Tennis Court Resurfacing

Is Mansfield ISD | Timberview High School - Tennis Court Resurfacing open in Arlington?

Mansfield ISD | Timberview High School - Tennis Court Resurfacing is still under construction in Arlington, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Mansfield ISD | Timberview High School - Tennis Court Resurfacing located?

Mansfield ISD | Timberview High School - Tennis Court Resurfacing is located at 7700 S. Watson Road, Arlington, TX, 76002, in Tarrant County.

Who is the owner or developer of Mansfield ISD | Timberview High School - Tennis Court Resurfacing?

Mansfield ISD is the property owner/developer of record for Mansfield ISD | Timberview High School - Tennis Court Resurfacing, per its TDLR project registration.

Who is the architect or design firm for Mansfield ISD | Timberview High School - Tennis Court Resurfacing?

Huckabee is the design firm of record for Mansfield ISD | Timberview High School - Tennis Court Resurfacing, according to its TDLR filing.

How much does Mansfield ISD | Timberview High School - Tennis Court Resurfacing cost and how big is it?

Mansfield ISD | Timberview High School - Tennis Court Resurfacing has an estimated construction value of $130K and approximately 1 square feet (about $130.00K/sqft), based on its TDLR filing.

Scope of Work

Mansfield ISD | Timberview High School - Tennis Court Resurfacing

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7700 S. Watson Road, Arlington, TX, 76002

Location by street address

Watch all construction in 76002 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists