Hotel Daphne Phase II in Houston, TX
347 West 20th Street, Houston, TX, 77008
Hotel Daphne Phase II is a new construction project at 347 West 20th Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $15.0M across about 11,832 sq ft.
- Estimated project value
- $15.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,832 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.27K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
99 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
364 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Hotel Daphne Phase II
Hotel Daphne Phase II is a new construction project located at 347 West 20th Street in Houston, Texas. The development adds 11,832 square feet of new space, including a two-story structure with ten king suites. The estimated cost for this expansion is $15,000,000. Wood Lane Partners is the owner of record for this specific filing in Harris County.
Scope and Design
The scope of work includes a single-story pool bar, event space, event kitchen, and meeting room. A new pool terrace is also part of the construction plan. The project is privately funded on private land for private use. The registered accessibility specialist for this filing is William T Winning.
Timeline and Status
The project was registered with TDLR in December 2025. Construction is scheduled to begin in April 2026. Plan review is pending, and completion is targeted for March 2027. The scheduled build window is 364 days. This duration is longer than the county median of 219 days for similar new construction filings in Harris County.
Financial metrics for this project place the estimated cost above the county median for its type. The cost per square foot is computed at $1,268, which is above the county median of $88 per square foot. These figures are derived from TDLR-registered new construction filings in Harris County. The project status is Project Registered.
Wood Lane Partners has two other TDLR-registered projects in Houston. One is Daphne Hotel with an estimated cost of $950,000, and the other is The Daphne Hotel with an estimated cost of $24,000,000. Both of these previous projects have completed inspection. This new phase represents a significant addition to the owner's portfolio in the area.
The surrounding neighborhood, ZIP code 77008, has a population of about 40,155 according to U.S. Census estimates. The median household income in this area is $142,414. Housing is mostly owner-occupied, with a median home value of $609,300. These demographic details provide context for the location of the new hotel expansion in Houston.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77008 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Hotel Daphne Phase II is a New Construction project located at 347 West 20th Street, Houston, TX 77008 in Houston, Texas. The project has an estimated value of $15.0M covering 11,832 sq ft. Wood Lane Partners is the property owner. The project was registered with TDLR on December 23, 2025.
Frequently Asked Questions
When is Hotel Daphne Phase II expected to be finished?
The project is targeted for March 2027. Construction is scheduled to start in April 2026. Plan review is pending. The total build window is 364 days.
What is the total cost of the new construction?
The estimated cost for Hotel Daphne Phase II is $15,000,000. This amount is above the county median for similar new construction projects in Harris County.
Who is the owner of this project?
Wood Lane Partners is the owner of record. They have two other registered projects in Houston that have completed inspection.
Is the hotel open for guests now?
The project is in the construction registration phase. Completion is targeted for March 2027. The record does not indicate that the facility is operating.
What features are included in the new phase?
The scope includes ten king suites, a pool bar, event space, event kitchen, meeting room, and a new pool terrace.
What is Hotel Daphne Phase II?
Hotel Daphne Phase II is a new construction project at 347 West 20th Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW 2-STORY, 10 KEY KING SUITES w/ SINGLE STORY POOL BAR, EVENT SPACE, EVENT KITCHEN, AND MEETING ROOM; AND NEW POOL TERRACE.
Is Hotel Daphne Phase II open in Houston?
Hotel Daphne Phase II is still under construction in Houston, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is Hotel Daphne Phase II located?
Hotel Daphne Phase II is located at 347 West 20th Street, Houston, TX, 77008, in Harris County.
Who is the owner or developer of Hotel Daphne Phase II?
Wood Lane Partners is the property owner/developer of record for Hotel Daphne Phase II, per its TDLR project registration.
How much does Hotel Daphne Phase II cost and how big is it?
Hotel Daphne Phase II has an estimated construction value of $15.0M and approximately 11,832 square feet (about $1.27K/sqft), based on its TDLR filing.
Scope of Work
NEW 2-STORY, 10 KEY KING SUITES w/ SINGLE STORY POOL BAR, EVENT SPACE, EVENT KITCHEN, AND MEETING ROOM; AND NEW POOL TERRACE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
347 West 20th Street, Houston, TX, 77008
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$40.0M totalWatch all construction in 77008 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.