EM South Houston Terminal Control Building is a new construction project at 10617 E Almeda St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $2.5M across about 4,536 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,536 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$551/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 29, 2025398 days across supplied datesJan 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    16 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    336 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About EM South Houston Terminal Control Building

ExxonMobil Corp is constructing a new terminal control building at 10617 E Almeda St in Houston, replacing an adjacent existing office structure. The project involves the new construction of the control facility and the demolition of the current office building. With an estimated cost of $2,500,000 and a total area of 4,536 sq ft, the development represents a significant capital investment in the South Houston terminal infrastructure.

Project Scope and Status

The filing describes the work as the new construction of the ExxonMobil South Houston Terminal Control Building and the demolition of the existing office building adjacent to the new construction. This scope indicates a complete replacement of the administrative space rather than a simple renovation. The project is privately funded and located on private land for private use. TDLR completed plan review in February 2026, and construction is scheduled to finish in January 2027, with work starting March 2026. The TDLR status for this registration is Review Complete.

Page Southerland Page, Inc. serves as the design firm of record for this project. The registered accessibility specialist is William T Winning. The site is located in Harris County, specifically in ZIP code 77051. This geographic detail is relevant for understanding the site's environmental classification, though it does not dictate the construction scope itself.

The estimated cost of $2,500,000 places this project in the top quarter of costs for new construction filings in Harris County. The median estimated cost for new construction in the county is $750,000. The project's cost per square foot is $551, which is above the county median of $88. The scheduled build window is 336 days, which is longer than the county median of 219 days for similar projects. These figures highlight the scale and complexity relative to typical commercial construction in the area.

City of Houston permit records show one permit on file at this street address, issued between June 2026 and June 2026. The permit type is Building Pmt, described as 4536 SF TERMINAL CONTROL BUILDING W/SITEWORK. This aligns with the square footage and scope detailed in the TDLR filing. The project name on the filing is EM South Houston Terminal Control Building. The owner of record is ExxonMobil Corp. The design firm has six other TDLR-registered projects totaling $13,037,135, including work at Ben Taub Hospital and the UTMB OT/PT Clinic in Galveston.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77051 (Houston)

One email per change. Unsubscribe in one click. Privacy.

EM South Houston Terminal Control Building is a New Construction project located at 10617 E Almeda St, Houston, TX 77051 in Houston, Texas. The project has an estimated value of $2.5M covering 4,536 sq ft. ExxonMobil Corp is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on December 29, 2025.

Frequently Asked Questions

When is the ExxonMobil South Houston Terminal Control Building scheduled to be completed?

Construction is scheduled to finish in January 2027. Work is set to start in March 2026, following the completion of plan review by TDLR in February 2026.

What is the estimated cost and size of the new control building?

The project has an estimated cost of $2,500,000. The total construction area is 4,536 square feet. This includes the new control building and the demolition of the adjacent existing office.

Who is the design firm for this project?

Page Southerland Page, Inc. is the design firm of record. William T Winning is the registered accessibility specialist listed on the TDLR filing for this project.

Is the building located in a flood zone?

No. The area is designated as zone X on the FEMA National Flood Hazard Layer.

What is the status of the TDLR registration?

The TDLR status is Review Complete. Plan review was finished in February 2026. The project is registered with TDLR for accessibility compliance under the TABS program.

What is EM South Houston Terminal Control Building?

EM South Houston Terminal Control Building is a new construction project at 10617 E Almeda St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW CONSTRUCTION OF EXXONMOBIL SOUTH HOUSTON TERMINAL CONTROL BUILDING AND DEMOLITION OF EXISTING OFFICE BUILDING ADJACENT TO THE NEW CONSTRUCTION

Is EM South Houston Terminal Control Building open in Houston?

EM South Houston Terminal Control Building is still under construction in Houston, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is EM South Houston Terminal Control Building located?

EM South Houston Terminal Control Building is located at 10617 E Almeda St, Houston, TX, 77051, in Harris County.

Who is the owner or developer of EM South Houston Terminal Control Building?

ExxonMobil Corp is the property owner/developer of record for EM South Houston Terminal Control Building, per its TDLR project registration.

Who is the architect or design firm for EM South Houston Terminal Control Building?

Page Southerland Page, Inc. is the design firm of record for EM South Houston Terminal Control Building, according to its TDLR filing.

How much does EM South Houston Terminal Control Building cost and how big is it?

EM South Houston Terminal Control Building has an estimated construction value of $2.5M and approximately 4,536 square feet (about $551/sqft), based on its TDLR filing.

Scope of Work

NEW CONSTRUCTION OF EXXONMOBIL SOUTH HOUSTON TERMINAL CONTROL BUILDING AND DEMOLITION OF EXISTING OFFICE BUILDING ADJACENT TO THE NEW CONSTRUCTION

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10617 E Almeda St, Houston, TX, 77051

Location by street address

Related City Permits

Building permits found at or near this location

10617 E ALMEDA RD, Houston, TX 77051

4536 SF TERMINAL CONTROL BUILDING W/SITEWORK 1-1-2-B/S2-B 2021 IBC

IssuedBuilding PmtJun 2026
HOU-25120585-BUILDINGPMT