Project intelligenceTDLR TABS2026009432Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Eldridge Pkwy Pedestrian Improvements (SW07_ELD)

Eldridge Pkwy from Oak Bend Forest Dr to Rosewood, Houston, TX, 77083

Target date passed (May 2026)Review Complete

Eldridge Pkwy Pedestrian Improvements (SW07_ELD) is a renovation/alteration project at Eldridge Pkwy from Oak Bend Forest Dr to Rosewood, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $931K across about 5,250 sq ft.

Estimated project value
$931K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$177/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 7, 2026142 days across supplied datesMay 29, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Eldridge Pkwy Pedestrian Improvements (SW07_ELD)

The Eldridge Pkwy Pedestrian Improvements project involves the addition of sidewalk and curb ramps along a stretch of Eldridge Parkway in Houston. This renovation/alteration spans approximately 5,250 sq ft of public right-of-way, running from Oak Bend Forest Drive to Rosewood Drive. The work is registered with TDLR under the identifier SW07_ELD, with an estimated total cost of $931,421.

Harris County Engineering Department is the owner of record for this infrastructure upgrade. The design firm of record is infraTECH Engineers & Innovators, LLC, which has handled several other roadway projects in the region. The registered accessibility specialist for this filing is Holly Respondek. The project is classified as a public works initiative involving public funds and land, subject to standard federal and state accessibility requirements.

Project Timeline and Status

TDLR completed the plan review process in February 2026. Construction was scheduled to begin in March 2026, with a planned completion date of May 2026. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection. Consequently, the current physical state of the site is not confirmed in the public record. The project status in the TDLR database is listed as Review Complete, indicating that design approvals are finalized but final construction verification is pending.

The estimated cost of $931,421 places this project in the top quarter of renovation/alteration filings in Harris County over the last 24 months. The median estimated cost for similar projects in the county is $250,000. The calculated cost per square foot is $177, which is above the county median of $80 per square foot. The scheduled build window of 88 days is close to the county median of 92 days for comparable projects.

Harris County Engineering Department has six other TDLR-registered projects totaling $5,425,960, including work on Morton Ranch Road and Colonial Parkway. infraTECH Engineers & Innovators, LLC has six other registered projects totaling $5,061,084, including Barker Cypress Rd and Park Row Blvd. The project is located in ZIP code 77083, where the U.S. Census estimates a population of about 74,843 and a median household income of $65,349. The area is primarily owner-occupied, with a median home value of $223,100.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77083 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Eldridge Pkwy Pedestrian Improvements (SW07_ELD) is a Renovation/Alteration project located at Eldridge Pkwy from Oak Bend Forest Dr to Rosewood, Houston, TX 77083 in Houston, Texas. The project has an estimated value of $931K covering 5,250 sq ft. Harris County Engineering Department is the property owner and infraTECH Engineers & Innovators, LLC is the design firm of record. The project was registered with TDLR on January 7, 2026.

Frequently Asked Questions

Is the Eldridge Pkwy project finished?

TDLR has not yet recorded a final inspection. While the scheduled completion date of May 2026 has passed, the public record does not confirm that construction is complete or that the site is open to the public.

Who is building the sidewalk on Eldridge Pkwy?

Harris County Engineering Department is the owner of record. infraTECH Engineers & Innovators, LLC is the design firm of record. The registered accessibility specialist is Holly Respondek.

How much does the Eldridge Pkwy renovation cost?

The estimated cost is $931,421. This is above the Harris County median of $250,000 for similar renovation/alteration projects. The cost per square foot is $177.

What is the scope of work for SW07_ELD?

The scope includes the addition of sidewalk and curb ramps. The project covers 5,250 sq ft of roadway frontage from Oak Bend Forest Dr to Rosewood.

Where exactly is the construction site located?

The site is on Eldridge Pkwy in Houston, TX 77083. The specific segment runs from Oak Bend Forest Drive to Rosewood Drive.

What is Eldridge Pkwy Pedestrian Improvements (SW07_ELD)?

Eldridge Pkwy Pedestrian Improvements (SW07_ELD) is a renovation/alteration project at Eldridge Pkwy from Oak Bend Forest Dr to Rosewood in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of sidewalk and curb ramps

Is Eldridge Pkwy Pedestrian Improvements (SW07_ELD) open in Houston?

Eldridge Pkwy Pedestrian Improvements (SW07_ELD) was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Eldridge Pkwy Pedestrian Improvements (SW07_ELD) located?

Eldridge Pkwy Pedestrian Improvements (SW07_ELD) is located at Eldridge Pkwy from Oak Bend Forest Dr to Rosewood, Houston, TX, 77083, in Harris County.

Who is the owner or developer of Eldridge Pkwy Pedestrian Improvements (SW07_ELD)?

Harris County Engineering Department is the property owner/developer of record for Eldridge Pkwy Pedestrian Improvements (SW07_ELD), per its TDLR project registration.

Who is the architect or design firm for Eldridge Pkwy Pedestrian Improvements (SW07_ELD)?

infraTECH Engineers & Innovators, LLC is the design firm of record for Eldridge Pkwy Pedestrian Improvements (SW07_ELD), according to its TDLR filing.

How much does Eldridge Pkwy Pedestrian Improvements (SW07_ELD) cost and how big is it?

Eldridge Pkwy Pedestrian Improvements (SW07_ELD) has an estimated construction value of $931K and approximately 5,250 square feet (about $177/sqft), based on its TDLR filing.

Scope of Work

Addition of sidewalk and curb ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Eldridge Pkwy from Oak Bend Forest Dr to Rosewood, Houston, TX, 77083

Location by street address

Watch all construction in 77083 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.